background image

 

 

 

30" SHARK 

Owner’s Manual

 

11

 

Grease Drum Shaft Bearings 

Lubricate main shaft bearings twice daily with one shots of special purpose grease suitable 

for operating conditions (see “Recommended Rolling Bearing

 

Lubricant Specifications” for 

lubricant requirements). 

 

 

 

Idler End Bearing  
Grease Point  
4 Shots Twice Daily 

 

Summary of Contents for 30" SHARK

Page 1: ...30 SHARK Owner s Manual...

Page 2: ...ule 7 Lubrication 8 30 SHARK Technical Specifications 9 Preventive Maintenance Instructions 10 DAILY 10 WEEKLY Every 50 Hours of Operation 14 MONTHLY Every 200 Hours of Operation Error Bookmark not de...

Page 3: ...of the Equipment and RWI shall at its expense return the Equipment to Customer in the same or equivalent manner that the Equipment was delivered to RWI Part s replaced during this Limited Hardware Wa...

Page 4: ...lcher the carrier other property or injury or death of operation personnel or pedestrians This unit must not be used within 100 meters of objects other machinery livestock pedestrians or personnel oth...

Page 5: ...cal personnel only RWI Ltd accepts no responsibility for damage or injury resulting from inadequate or improper installation of its products WARNING When servicing cutters the cutting drum must be mec...

Page 6: ...vestock and roadways are greater than 100 meters from where the mulching equipment is being operated The operator must always remain inside the operator s compartment while the mulcher drum is turning...

Page 7: ...mulching head horizontal toward the right side of the tree 2 Using the left or discharge side of the mulching drum slowly cut into the right portion of the treetop being careful not to cut the top of...

Page 8: ...ng bearing grease 1 shot each x Lubricate drive coupling with multipurpose EP grease 2 shots x Inspect cutters for excessive wear or breakage x Inspect tool Holders for excessive wear or damage x Insp...

Page 9: ...ct specification and inadequate application of the lubricant Use of FAG Arcanol Multitop Rolling Bearing Lubricant is recommended for use in the lubrication of all Torrent Shark series drum shaft bear...

Page 10: ...nimum 3200 max continuous Carrier power requirement 40 Hp or 28 Kw minimum Cutter type Fixed round or square Cutter quantity 24 Drive type Direct Power transmission type Hydraulic fluid power Hydrauli...

Page 11: ...ks or Damage The hydraulic hose assemblies connecting the mulching unit to the boom of the carrier are exposed to impact and abrasion as a normal course of operation Hydraulic hoses and fittings must...

Page 12: ...Lubricate main shaft bearings twice daily with one shots of special purpose grease suitable for operating conditions see Recommended Rolling Bearing Lubricant Specifications for lubricant requirement...

Page 13: ...quarely on the ground or other flat solid surface and with the carrier in a ZERO ENERGY STATE apply two shots of multipurpose ie Pin and bushing grease to the grease fitting into the side of the cutti...

Page 14: ...d lock washer 2 Turn 90 degrees or as required to expose a new cutting edge if no new edges remain replace the cutter with a new one 3 Torque to 75 Nm Do not use an impact wrench to tighten the cutter...

Page 15: ...up and down may indicate worn or damaged bearings Excessive endplay may be detected by placing a pry bar between the cutting frame and either end of the cutting drum A small amount of end play approx...

Page 16: ...l procedures to be carried out on the 30 SHARK must be performed with the unit resting squarely on the ground or other flat solid surface and with the carrier in a ZERO ENERGY STATE The 30 SHARK is a...

Page 17: ...gned with an 8 bolt pattern for the purpose of anchoring a quick coupler to match that of recipient excavator The dimensions of the deck plate and the bolting pattern are supplied in the following dia...

Page 18: ...30 SHARK Owner s Manual 17...

Page 19: ...ing the rotor from dead stop to full speed The minimum recommended pressure supply line size is 19mm inside diameter and capable of withstanding pressure established by the circuit relief setting Main...

Page 20: ...30 SHARK Owner s Manual 19...

Page 21: ...draulic motor when the mulching drum typically rotating at over 3000 rpm contacts hard immoveable objects that are often not visible to the operator Case Drain Pressure Gauge A pressure gauge and T as...

Page 22: ...and corrected Oil issuing from the vent while the excavator is running while the mulching pressure circuit is turned off indicates the pressure is being applied to the case drain circuit by the excava...

Page 23: ...sed to a standing level of water snow etc Covers should be removed and the unit drained of any accumulated water hoses should be capped or covered to prevent corrosion or contamination and preservatio...

Page 24: ...tter 3005492 Cutter Hex Bolt x 1 UNF Grade 8 c w High Collar Lock Washer 3005493 Drum Shaft 3004001 Power Lock Coupling 3004001 Flanged Cartridge Bearing Assembly Idler 3004003 Flanged Cartridge Beari...

Page 25: ...30 SHARK Owner s Manual 24...

Page 26: ...30 SHARK Owner s Manual 25...

Reviews: