
Installation
4
DESCRIPTION
USE
QTY.
PTO Pulley
Key
Square head set-screw 5/16–18 x 1/2” (13 mm)
Blower belt
Thread lock
1
1
2
1
1
Install PTO drive pulley to PTO gearbox
Blower
Blower outlet chute
Bolt 5/16–18 x 5” (127 mm)
Flange locknut 5/16–18
Guide strap
Bolt 1/4–20 x 3/4 (19 mm)
Flange locknut 1/4–20
1
1
2
2
3
3
3
Assemble blower and outlet chute
Bumper
Tilt brackets
Bolt 3/8–16 x 1” (26 mm)
Flange locknut 3/8–16
Bolt 1/2–13 x 2-3/4” (70 mm)
Bolt 1/2–13 x 1-1/4” (32 mm)
Locknut 1/2–13
Gas spring
Safety clip
Ball stud
Locknut 5/16–18
Draw latch
Washer 1/2” (13 mm)
Bolt 1/2–13 x 1” (26 mm)
Hopper assembly
Clevis pin 1/2 x 1-1/2” (38 mm)
Hairpin cotter–large
1
2
4
4
2
2
5
1
2
2
2
1
1
1
1
2
2
Install bumper and gas spring to traction unit
Wire harness
Cable ties–8 large, 4 small
Buzzer
1
4
1
Install wire harness and buzzer
Clevis pin 3/8 x 1” (26 mm)
Hairpin cotter–small
1
1
Lockout for blower belt when Recycler
is
installed
Operator’s Manual
Parts Catalog
1
1
Read before operating
Ordering parts
Summary of Contents for Z-Master
Page 24: ......