7
Internal Repeater Installation - Toro Network LTC Plus Satellite - Plastic Pedestal
To complete this installation, you will need an internal repeater, a power supply board (to plug into the LTC
Plus 13 VAC power supply) and a 1/4" (6.4mm) #20 x 5/8" (15.9mm) socket head cap screw.
Step 1 Turn the power source OFF
to the Network LTC Plus
satellite controller and
remove the front plastic
door.
Step 2 Mount the repeater on the
inside wall of the pedestal
(on either side) using a
1/4" (6.4mm) #20 x 5/8"
(15.9mm) socket head cap
screw.
Step 3 Mount the power conversion
board on the inside of
the satellite opposite the
repeater using the adhesive
back. See
Figure 13
.
Step 4 Connect the power supply
board (TG PS) to the power
source. See
Figure 14
.
Step 5 Connect the power
conversion board to the
repeater using the power
connector cable.
Step 6 Turn the power source back
ON to the satellite.
Step 7 Record the repeater ID and
location in the Installation
Log.
Step 8 Proceed to the Internal
Repeater Startup Procedure
section.
Figure 13
Figure 14
Repeater
Power Supply Board
(TG-PS)
To Circuit Board
To Power Cable
English
Summary of Contents for Turf Guard
Page 15: ...13 Notes English ...
Page 29: ...27 Notas Español ...
Page 43: ...41 Notes Français ...
Page 57: ...55 Notes Italiano ...
Page 58: ...56 ...
Page 59: ...57 ...