•
If the distance is correct, remove the carrier
frame and proceed with the setup instructions.
•
If the distance is not 1/4 inch (6 mm), adjust the
lift cylinder as follows:
A. Remove the clevis pin securing the rod end
of the lift cylinder to the lift arm (Figure 3).
B. Loosen the hex nut securing the clevis to the
cylinder rod.
C. Rotate the clevis end in or out until you
attain 1/4 inch (6 mm) clearance. Check the
adjustment and repeat steps 2 through 3 as
required.
D. Tighten the hex nut and connect the cylinder
rod end to the lift arm (Figure 3).
3
Mounting the Carrier Frames
to the Cutting Units
Parts needed for this procedure:
6
Washer
3
Bolt (3/8 x 2-1/4 inches)
3
Locknut (3/8 inch)
Procedure
1. Remove the cutting units from the cartons. Adjust
them per the
Cutting Unit Operator’s Manual
.
2. Position a carrier frame onto each cutting unit,
aligning the mounting holes with the mounting links
(Figure 4).
G009852
1
3
2
Figure 4
1.
Carrier frame
3.
Bearing housing cover
2.
Mounting link
3. Secure each mounting link to the carrier frame with
a bolt (3/8 x 2-1/4 inches), 2 washers, and a locknut,
as shown in Figure 4. Position a washer on each
side of the link when mounting. Torque to 31 ft-lb
(42 N-m).
4
Installing the Front Lift Arms
Parts needed for this procedure:
2
Lift arm
2
Pivot rod
2
Bolt (5/16 x 7/8 inch)
2
Lock washer
2
Lift chain
4
Clevis pin
4
Cotter pin
Procedure
1. Insert a pivot rod into the left lift arm and align the
mounting holes (Figure 5).
14