![Toro Reelmaster 2000 Operator'S Manual Download Page 13](http://html.mh-extra.com/html/toro/reelmaster-2000/reelmaster-2000_operators-manual_1132156013.webp)
Description
Qty.
Use
Operator’s Manual
1
Engine Operator’s Manual
1
Read before operating the machine.
Operator training material
1
View before operating the machine.
Parts Catalog
1
View and order parts.
Certificate of compliance
1
CE certification
Note:
Determine the left and right sides of the machine
from the normal operating position.
1
Installing the Rear Wheel
Parts needed for this procedure:
1
Wheel assembly
4
Lug nut
Procedure
1. Mount the wheel assembly onto the rear wheel hub
G009850
1
2
3
Figure 2
1.
Wheel assembly
3.
Lug nut
2.
Rear wheel hub
2. Install the lug nuts (Figure 2) and tighten them to 45
to 65 ft-lb (3 to 5 N-m).
2
Adjusting the Rear Carrier
Frame Height
Parts needed for this procedure:
1
Rear carrier frame
Procedure
1. Slide the rear carrier frame onto the rear lift arm
pivot rod (Figure 3). Do not install the carrier frame
to the cutting unit at this time.
G009851
1
3
3
2
4
Figure 3
1.
Rear carrier frame
3.
Up stop
2.
Pivot rod
4.
Lift cylinder
2. Raise the lift arms and carrier frame fully.
3. Press down on one end of the carrier frame until the
up stop on the opposite end contacts the underside
of the foot step (Figure 3).
The distance between the up stop and the underside
of the foot step, on the end pressed down, should be
approximately 1/4 inch (6 mm).
13