11
Set-up
Loose Parts
Note:
Use the chart below to verify all parts have been shipped.
DESCRIPTION
QTY.
USE
Upper Handle
Flanged bolt 3/8–16 x 1” (26 mm)
Flange nut 3/8–16
1
4
4
Install upper handle to frame
R-clamp
1
Secure throttle and choke cables
Shift lever
Shift lever mounting bracket
Washer 1/4”
Bolt 1/4–28 x 2” (51 mm)
1
1
1
1
Install shift lever to transmission
Rod fitting
Clevis pin
Washer
Hairpin cotter
2
2
2
2
Install control rods
Fuel tank
Control panel
Bolt 5/16–18 x 7/8” (22.5 mm)
Lock washer 5/16”
Washer 5/16”
Hose clamp
1
1
4
4
4
2
Install fuel tank and control panel
Lock nut 1/4–20
Cable tie
1
1
Install wire harness
Wire tie
1
Retain wire harness
Lock nut 5/16–18
Lock nut 1/4–20
1
1
Secure negative battery cable to engine bolt
Secure positive battery cable to solenoid
Summary of Contents for ProLine 30180
Page 7: ...Safety 5 Slope Chart Read all safety instructions on pages 2 9 ...
Page 8: ...6 ...
Page 38: ...Maintenance 36 Wiring Diagram c 2323 _ ...
Page 42: ......
Page 43: ......
Page 44: ......