Installation

Note:

Determine the left and right sides of the

machine from the normal operating position.

1

Preparing the Machine

No Parts Required

Procedure

1.

Park the machine on a level surface.

2.

Disengage the PTO and engage the parking
brake.

3.

Shut off the engine, remove the key, and wait
for all moving parts to stop before leaving the
operating position.

2

Assembling the Bagger

Parts needed for this procedure:

1

Back plate

1

Support

1

Mounting bracket

7

Bolt (1/4 x 5/8 inch)

7

Locknut (1/4 inch)

1

Clamp

1

Bolt (3/8 x 3/4 inch)

1

Locknut (3/8 inch)

1

Left latch

1

Right latch

4

Phillips-head screw

4

Locknut (#10)

4

Lock washer

Procedure

1.

Install the support on the back plate using 4
bolts (1/4 x 5/8 inch) and 4 locknuts (1/4 inch);

Figure 1

.

g314767

Figure 1

1.

Back plate

3.

Support

2.

Locknuts (1/4 inch)

4.

Bolts (1/4 x 5/8 inch)

2.

Install the mounting bracket to the back plate
with 3 bolts (1/4 x 5/8 inch) and 3 locknuts (1/4
inch);

Figure 2

.

Note:

For 36-inch and 48-inch decks, an

adapter kit is needed. Order Part no. 121-7515.

g314768

Figure 2

1.

Bolts (1/4 x 5/8 inch)

3.

Back plate

2.

Mounting bracket

4.

Locknuts (1/4 inch)

3.

Install the clamp to the bagger and adapter with
a bolt (3/8 x 3/4 inch) and locknut (3/8 inch);

Figure 3

.

2

 

Summary of Contents for ProLine 139-7860

Page 1: ...l danger Replace any decal that is damaged or missing decal114 3489 114 3489 1 Thrown object hazard cutting dismemberment hazard do not operate the machine with the discharge opening uncovered always...

Page 2: ...1 Bolt 3 8 x 3 4 inch 1 Locknut 3 8 inch 1 Left latch 1 Right latch 4 Phillips head screw 4 Locknut 10 4 Lock washer Procedure 1 Install the support on the back plate using 4 bolts 1 4 x 5 8 inch and...

Page 3: ...Frame Parts needed for this procedure 1 Bag and pan 1 Catcher frame 2 Handle 4 Bolt 1 4 x 1 inch 4 Locknut 1 4 inch 4 Washer 1 4 inch Procedure 1 Slide the upper curved portion of the bagger frame in...

Page 4: ...bolt 3 Nut 5 16 inch 1 Locknut 3 8 inch Procedure Note For 48 inch and 54 inch decks use the rounded edge discharge baffle for 36 inch and 60 inch decks use the square edge discharge baffle Figure 7...

Page 5: ...e 2 For 36 inch decks Bolt 3 8 x 1 inch for 60 inch decks Button head bolt 5 For 36 inch decks Locknut 3 8 inch for 60 inch decks Nut 5 16 inch 3 Nut 5 16 inch 3 For 48 inch and 54 inch decks Install...

Page 6: ...hine unless you install a mulch plate discharge deflector or grass collection system 6 Installing the Bagger onto the Machine No Parts Required Procedure 1 Position the front and rear tab on the bagge...

Page 7: ...pins into them Figure 13 8 Lower the latches to secure the bagger g002161 Figure 13 1 Back plate holes 3 Latch 2 Frame pin 4 Lower pin Product Overview g315746 Figure 14 1 Bagger Specifications Machi...

Page 8: ...er the latches to secure the bagger Clearing Obstructions 1 Disengage the PTO and engage the parking brake 2 Shut off the engine remove the key and wait for all moving parts to stop before leaving the...

Page 9: ...bagger attachment Cleaning the Bagger Service Interval Before each use or daily Clean the bagger after each use 1 Remove the bag and wash the back plate and the underside of the machine Use a mild aut...

Page 10: ...Notes...

Page 11: ...Notes...

Page 12: ......

Reviews: