g002332
Figure 39
1.
Boom hinge spring
2.
Jam nut
4.
Repeat the procedure for each spring on both
boom hinges.
5.
Move the booms into the transport “X” position.
Note:
See
Using the Boom Transport Cradle
(page 50)
for more information.
19
Storing the Jack Stands
(Optional)
Parts needed for this procedure:
2
Front jack stand
2
Rear jack stand
4
Cotter pin
2
Clevis pin (4-1/2 inch)
2
Clevis pin (3 inch)
2
Knob
Procedure
1.
Insert the front jack stands upside down into the
frame near the front tie-down points (
).
g023740
Figure 40
1.
Front jack stand
2.
Knob
2.
Secure the front jack stands with 2 clevis pins (3
inch) and 2 cotter pins through the middle hole
on the stands.
3.
Insert the rear jack stands from the bottom, up
into the frame, near the rear tie-down points
(
).
g023739
Figure 41
1.
Rear jack stand
4.
Secure the rear jack stands with 4 clevis pins
(4-1/2 inch) and 4 cotter pins through the last
hole on the stands.
34
Summary of Contents for Multi Pro WM 41240
Page 79: ...Schematics g255886 Flow Diagram Sprayer System DWG 125 0699 Rev B 79...
Page 80: ...Notes...
Page 81: ...Notes...
Page 82: ...Notes...