Operation
Note:
Determine the left and right sides of the machine from the normal operating position.
Before Operation
Installing the Battery Pack
Important:
Operate the battery pack only in temperatures that are within the appropriate range; refer
to
Specifications (page 10)
.
1.
Make sure that the vents on the battery are clear of any dust and debris.
2.
Lift up the battery-compartment lid (A of
).
3.
Line up the cavity in the battery pack with the tongue on the machine and slide the battery pack into the
compartment until it locks into place (B of
4.
Close the battery-compartment lid (C of
g274513
Figure 8
11
Summary of Contents for Flex Force Power System 20361
Page 2: ......
Page 26: ......
Page 34: ...decal139 8986 139 8986 8 ...
Page 37: ...3 Ensamblaje de la bolsa de recogida No se necesitan piezas Procedimiento g235791 Figura 4 11 ...
Page 52: ......
Page 62: ...3 Montage du bac à herbe Aucune pièce requise Procédure g235791 Figure 4 10 ...