g037607
Figure 11
1.
Transmission bolt
3.
Tower-panel bolt
2.
Nut
4.
Right mount bracket
10.
Use the bolts and nuts you removed in step
to
secure the right mount bracket and fan shroud
to the frame (
). Torque the bolts to 37
to 45 N∙m (27 to 33 ft-lb).
11.
Loosely install the front mount bracket to the
front of the control tower using 2 carriage bolts
(1/4 x 5/8 inch) and 2 nuts (1/4 inch) as shown
in
g037608
Figure 12
1.
Front of the control tower
3.
Front mount bracket
2.
Carriage bolt (1/4 x 5/8
inch)
4.
Nut (1/4 inch)
12.
Lower the operator’s platform.
13.
Install the right tire, torque the lug nuts to 115 to
142 N∙m (85 to 105 ft-lb), and lower the machine
(
).
10