3
Tightening all Mounting Bolts
No Parts Required
Procedure
Note:
All mounting bolts need to be torqued to 48 N-m
(35 ft-lb).
1.
Tighten the bagger mounting bracket to the rear frame
first.
2.
Tighten the ROPS and side brackets to the side of the
machine.
3.
If the bagger mounting bracket moves side to side
0.32 cm (1/8 inch) or more, install one or both of the
spacers between the bagger mounting bracket and
mounting plates (
, and
).
4.
Tighten the bagger mounting bracket to the side
brackets.
4
Installing the Hood Assembly
and Bags
Parts needed for this procedure:
1
Hood assembly
3
Bags
2
Clevis pin
2
Hairpin cotter
Procedure
1.
Install the hood assembly onto the bagger mounting
bracket (
Figure 7
1.
Hood assembly
2.
Bagger mounting bracket
2.
Install the 2 clevis pins into the hood assembly and
bagger mounting bracket. Secure them with 2 hairpin
cotters (
).
Figure 8
1.
Hood assembly
3.
Hairpin cotter
2.
Bagger mounting bracket
4.
Clevis pin
3.
Install the bag tab into the notch in the hood assembly.
Do this for all bags (
Note:
The bags will rest on the bagger frame.
8