5
Installing the Forward Hose
Parts needed for this procedure:
1
Bulkhead
1
O-ring
1
Locking ring
2
Retaining fork
1
Forward hose assembly
1
Gasket
1
Worm-screw clamp
1
R-clamp
1
Carriage bolt (5/16 x 1 inch)
1
Lock nut (5/16 inch)
Drilling the Tank
1.
Locate the forward location on the top of the tank as
shown in
Note:
Locate the drill mark in the center of the
molded circle.
G014021
1
2
3
Figure 17
1.
Molded circle
3.
Drill point, center of the
molded circle
2.
Drill with hole saw
2.
Use a 9 cm (3-5/8 inch) hole saw to drill a hole at the
drill mark (
Note:
You will need to increase the diameter slightly
to accommodate the bulkhead.
3.
After drilling the hole, remove any rough edges in the
cut, and remove any debris that entered the main tank
during the cutting process.
Installing the Bulkhead
1.
Open the main tank lid and remove the filter screen.
2.
Install the bulkhead and the O-ring up from inside the
tank through the previously cut opening (
).
G014022
1
2
3
4
Figure 18
1.
Locking ring
3.
O-ring
2.
Hole, cut previously
4.
Bulkhead
3.
Secure the bulkhead to the tank with the locking ring.
Installing the Hose
1.
Install an R-clamp over the exposed threads of the
front strap’s side bolt.
2.
Install the hose end with the 90° fitting to the
previously installed bulkhead using a retaining fork
(
).
G014014
1
2
3
4
5
Figure 19
1.
Retaining fork
4.
Lock nut
2.
Eductor hose assembly
5.
R-clamp and locknut (5/16
inch)
3.
Hose
3.
Feed the open end of the hose down and through the
R-clamp to the eductor.
11
Summary of Contents for 41622
Page 18: ...Notes 18...