Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Description
Qty.
Use
Grommet,large
1
Carriage bolt (5/16 x 3/4 inch)
2
Lock nut (5/16 inch)
2
Computer console assembly
1
Hand Knob
2
Pivot bracket (2009 and older only)
1
Hose barb fitting, 90 degree
1
Hose, long
1
Hose clamp
5
Screw, flange head (1/4 x 3/4 inch)
2
Lock nut (1/4 inch)
2
Flowmeter
1
Gasket
2
Flowmeter barb fitting, straight
2
Hose clamp, worm screw
2
Hose, short
1
Boom valve caps
3
Plug
1
O-ring, large
1
Install the ProControl (for model year 2009 and older only).
Grommet,large
1
Mounting bracket (2010 and newer only)
1
Carriage bolt (5/16 x 3/4 inch)
4
Lock nut (5/16 inch)
4
Computer console assembly
1
Hand Knob
2
Pivot bracket (2010 and newer only)
1
Hose barb fitting, 90 degree
1
Hose (49in length)
1
Hose clamp
5
Screw, flange head (1/4 x 3/4 inch)
2
Lock nut (1/4 inch)
2
Flowmeter
1
Gasket
2
Flowmeter barb fitting, straight
2
Hose clamp, worm screw
2
Hose, (53in length)
1
Boom valve caps
3
Plug
1
O-ring, large
1
Install the ProControl (for model year 2010 and newer
only).
Note:
Determine the left and right sides of the machine from the normal operating position.
Note:
Duplications in the parts list is to distinguish needed parts for the different installation procedures as they
pertain to changes in the machine from model year to model year. Use the parts list for the model year of the
machine targeted for installation. Surplus parts may remain.
4