Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
Description
Qty.
Use
Handle
1
Bolts
4
Belleville washers
4
1.
Flange nut
1
Install the handle.
Speed selector rod
1
Cotter pin
1
2.
Flat washer
1
Install the speed selector rod.
3.
Flange locknut
1
Install the traction rod.
Clevis pin
1
4.
Cotter pin
1
Install the auger/impeller drive control
linkage.
Chute control rod assembly (rod and
bracket, worm gear, and bracket)
1
Carriage bolt
1
Belleville washer
1
Hex head bolt
1
5.
Locknut
2
Install the chute control rod.
6.
No parts required
–
Fill the engine with oil.
7.
No parts required
–
Check the tire pressure.
8.
No parts required
–
Check the skids and scraper.
1. Installing the Handle
1
Handle
4
Bolts
4
Belleville washers
1
Flange nut
Procedure
1. Remove the tie straps that secure the control rods
to the handle.
2. Remove the axle pins from both wheels and slide the
wheels outward on the axle approximately 1 inch (3
cm) (Figure 3).
Figure 3
1.
Axle pin (2)
3.
Handle
2.
Cap screw and curved
washer (4)
7
Summary of Contents for 38605
Page 27: ...Notes 27 ...