6
3
Step
Installing the Cutting Deck
1. Position the cutting deck under the carrier frame.
2. Mount the cutting deck to the carrier frame with
4 clevis pins and hairpin cotters (Fig. 4).
Note: All four pins must be in the same hole locations
to prevent uneven cutting.
8
11
1
3
5
7
2
4
6
m2683
9
10
Figure 4
1.
2 in (51 mm) cutting
height
2.
2-1/2 in (64 mm) cutting
height
3.
3 in (76 mm) cutting
height
4.
3-1/2 in (89 mm) cutting
height
5.
4 in (102 mm) cutting
height
6.
4-1/2 in (114 mm) cutting
height
7.
5 in (127 mm) cutting
height
8.
Clevis pin
9.
Carrier frame
10. Cutting deck
11. Hairpin cotter
4
Step
Installing the Drive Belt
1. Remove the hand knobs that hold the deck cover to the
top of the cutting unit and remove the deck cover.
2. Install the drive belt around the drive pulley on the
traction unit and the upper groove of the center spindle
pulley.
Note: The belt must be between the belt guides (Fig. 5).
1
2
3
4
m7680
Figure 5
1.
Belt guide (2)
2.
Traction unit drive pulley
3.
Drive belt
4.
Center spindle pulley
3. Install the deck cover onto the cutting unit, then install
and tighten the hand knobs.
4. Thread jam nuts (2 1/2 in) approximately 9 in (22.8 cm)
up on each adjusting shaft (Fig. 6).
Summary of Contents for 30149
Page 20: ......