Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
Description
Qty.
Use
1
Boom assembly (sold separately)
1
Install the boom.
2
Digging chain (sold separately)
1
Install the digging chain.
3
Crumber (provided with boom)
1
Install the crumber
4
No parts required
–
Install the spoils auger.
1
Installing the Boom
Parts needed for this procedure:
1
Boom assembly (sold separately)
Procedure
1.
Install the trencher to the traction unit; refer to
the
Operator’s Manual
for the traction unit.
2.
Raise the trencher about 15 cm (6 inches) off
the ground.
3.
Shut off the engine and remove the key.
4.
Remove the jam nuts and tensioning bolt on
each side of the boom (
).
5.
Thread 2 jam nuts onto each bolt to the head
of the bolt.
6.
Insert the bolts into the tubes, with the head of
the bolt and nuts facing the end to be installed
on the drive head (
7.
Slide the boom over the arm on the drive head
(
).
g280085
Figure 3
1.
Boom
3.
Tensioning bolt (2)
2.
Arm
4.
Jam nut (4)