![Toro 22187 Operator'S Manual Download Page 8](http://html1.mh-extra.com/html/toro/22187/22187_operators-manual_1133053008.webp)
Note:
You can adjust the handle height
for comfortable operation. Stand behind the
handle to determine the height. To adjust the
handle height, position the cap screws and the
locknuts that secure the handle latches to the
handle into the other mounting holes in the
latches.
3. Slide the bag support rod through the second
from the top mounting holes in the handle and
secure each end with a cap locknut (Figure 3).
4. Use a cable tie to secure the control cables to
the left handle below the bag support rod.
Step
2
Installing the Starter Rope
No Parts Required
Procedure
Pull the starter rope through the rope guide on the
handle (Figure 4).
Figure 4
1. Starter rope
2. Rope guide
Note:
To make the rope easier to install, squeeze
the control bar on the handle.
Step
3
Installing the Fuel Tank and
the Fuel Line
Parts needed for this step:
2
Self-tapping screw
1
Fuel tank
Procedure
1. Slide the end of the fuel line onto the elbow
fitting (Figure 5).
Figure 5
1. Fuel tank
3. Fuel line
2. Elbow tting
4. Fuel line clamp
2. Secure the fuel line in place with the fuel line
clamp (Figure 5).
3. Slide the plastic clips on the front of the fuel
tank onto the fuel tank mount (Figure 6).
8