background image

Procedure

Note:

All holes exist in the mower deck for installing the new baffles.

1.

Install the right baffle into the deck (

Figure 3

).

2.

Loosely secure the right baffle to the top of the deck using 2 bolts (1/2 x 1 inch), 2 tapping bolts (3/8 x 1
inch), 2 nuts (1/2 inch), 2 washers (1/2 inch), and 2 flange nuts (3/8 inch) as shown in

Figure 3

.

3.

Loosely secure the right baffle to the rear baffle using 1 bolt (3/8 x 1 inch) and 1 nut (3/8 inch) as shown
in

Figure 3

.

4.

Install the left baffle into the deck (

Figure 3

).

5.

Loosely secure the left baffle to the top of the deck using 3 tapping bolts (3/8 x 1 inch) and 3 flange
nuts (3/8 inch) as shown in

Figure 3

.

6.

Loosely secure the left baffle to the rear baffle using 1 bolt (3/8 x 1 inch) and 1 nut (3/8 inch) as shown
in

Figure 3

.

7.

Tighten the bolts then the nuts.

g316075

Figure 3

1.

Bolt (1/2 x 1 inch)

6.

Left baffle

2.

Washer (1/2 inch)

7.

Bolt (3/8 x 1 inch)

3.

Nut (1/2 inch)

8.

Nut (3/8 inch)

4.

Flange nut (3/8 inch)

9.

Rear baffle

5.

Tapping bolt (3/8 x 1 inch)

10.

Right baffle

7

 

Summary of Contents for 140-8016

Page 1: ...ut 3 8 inch 5 Right baffle 1 Bolt 1 2 x 1 inch 1 Nut 1 2 inch 1 4 Washer 1 2 inch 1 Install the baffles for 52 inch decks Left baffle 1 Bolt 3 8 x 1 inch 2 Nut 3 8 inch 2 Tapping bolt 3 8 x 1 inch 5 F...

Page 2: ...llowing procedure to prepare the machine for attaching the blower and finishing kit 1 Disengage the PTO move the motion control levers to the NEUTRAL LOCK position and set the parking brake 2 Shut off...

Page 3: ...s first before removing the bolts 1 Remove the cam locks washers nut and bolt from the adjustable flow baffle Figure 1 2 Remove the bolts and nuts securing the left baffle Figure 1 3 Remove the bolts...

Page 4: ...es For 52 inch Decks Parts needed for this procedure 1 Left baffle 2 Bolt 3 8 x 1 inch 2 Nut 3 8 inch 5 Tapping bolt 3 8 x 1 inch 5 Flange nut 3 8 inch 1 Right baffle 1 Bolt 1 2 x 1 inch 1 Nut 1 2 inc...

Page 5: ...8 x 1 inch and 1 nut 3 8 inch as shown in Figure 2 4 Install the left baffle into the deck Figure 2 5 Loosely secure the left baffle to the top of the deck using 3 tapping bolts 3 8 x 1 inch and 3 fla...

Page 6: ...es For 60 inch Decks Parts needed for this procedure 1 Left baffle 2 Bolt 3 8 x 1 inch 2 Nut 3 8 inch 5 Tapping bolt 3 8 x 1 inch 5 Flange nut 3 8 inch 1 Right baffle 2 Bolt 1 2 x 1 inch 2 Nut 1 2 inc...

Page 7: ...8 x 1 inch and 1 nut 3 8 inch as shown in Figure 3 4 Install the left baffle into the deck Figure 3 5 Loosely secure the left baffle to the top of the deck using 3 tapping bolts 3 8 x 1 inch and 3 fl...

Page 8: ...es For 72 inch Decks Parts needed for this procedure 1 Left baffle 2 Bolt 3 8 x 1 inch 2 Nut 3 8 inch 5 Tapping bolt 3 8 x 1 inch 5 Flange nut 3 8 inch 1 Right baffle 2 Bolt 1 2 x 1 inch 2 Nut 1 2 inc...

Page 9: ...8 x 1 inch and 1 nut 3 8 inch as shown in Figure 4 4 Install the left baffle into the deck Figure 4 5 Loosely secure the left baffle to the top of the deck using 3 tapping bolts 3 8 x 1 inch and 3 fl...

Page 10: ...edure 1 Remove the existing bolts and nuts in the holes for the kickers Figure 5 2 Install the new kickers to the mower deck in the locations shown in Figure 5 3 Secure the kickers using 4 carriage bo...

Page 11: ...Notes...

Page 12: ......

Reviews: