g218544
Figure 1
1.
Roller shaft
7.
Flat washer
2.
Ball stud
8.
Spacer
3.
Ball-joint receiver
9.
Bushing
4.
Jam nut
10.
Pull-link assembly
5.
Pull-link extension
11.
Anti-scalp roller
6.
Bolt
2.
Remove the bolts and roller shafts securing the
anti-scalp rollers and the pull-link assemblies to
each carrier frame (
3.
Disassemble the pull-link assemblies (
).
4.
Thread the previously removed jam nut onto
each of the new longer pull-arm extensions
and onto the existing pull-link and bushing
assemblies (
)
g218546
Figure 2
1.
Roller shaft
9.
Spacer
2.
Ball stud
10.
Bushing
3.
Ball-joint receiver
11.
Pull-link liner
4.
Jam nut
12.
Pull-link assembly
5.
Long pull-link extension
13.
Link bracket
6.
Carriage bolt
14.
Bolt (3/8 x 1-1/2 inches)
7.
Locknut
15.
Anti-scalp roller
8.
Flat washer
5.
Assemble the new longer pull-arm extensions to
the existing pull-link assemblies and ball-joint
receiver assemblies (
). Do not tighten
the jam nuts at this time.
6.
Mount the appropriate link bracket (left or right)
and a previously removed anti-scalp roller to
the end of each front carrier frame with a new
carriage bolt and the previously removed roller
shaft. Position the brackets as shown in
7.
Mount a pull-link assembly to the outside of each
link bracket with a bolt (3/8 x 1-1/2 inches), flat
washer, bushing, the previously removed spacer
and flat washer, and a new locknut (
).
Note:
Make sure that the bushing is inside the
pull-link assembly.
8.
Slide back the sleeve on the ball-joint receivers
and install the receivers onto the ball studs
(
).
9.
Mount a basket onto the carrier frame.
10.
Adjust the pull arms until there is a 6 to 10 mm
(1/4 to 3/8 inch) clearance between the lip of the
basket and the reel blades.
2