![Toro 08716 Operator'S Manual Download Page 3](http://html1.mh-extra.com/html/toro/08716/08716_operators-manual_1131431003.webp)
Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
Description
Qty.
Use
1
No parts required
–
Adjust the tire pressure.
2
No parts required
–
Remove the shipping board from the
machine.
Center assembly
1
Right-side assembly
1
Left-side assembly
1
Bolt (3/4 x 3-1/2 inches)
2
Locknut (3/4 inch)
2
Long spacer
2
3
Cable guard
2
Connect the center assembly and the
side assemblies.
Drawbar
1
Bolt (3/4 x 3-1/2 inches)
1
Locknut (3/4 inch)
1
4
Long spacer
1
Connect the drawbar to the rake.
Boom assembly
1
Carriage bolt (3/8 x 3/4 inch)
2
Flange nut (3/8 inch)
2
5
Bolt (1/4 x 5/8 inch)
1
Attach the boom.
Cable
2
Shoulder bolt
4
6
Flange nut (5/16 inch)
4
Attach the cables.
Stop-chain assembly
1
U-bolt
1
7
Flange nut (5/16 inch)
2
Attach the stop-chain assembly.
Media and Additional Parts
Description
Qty.
Use
Bolt (5/16 x 2-1/2 inches)
2
Flange locknut (5/16 inch)
2
Shackle
2
Bolt (3/4 x 4-1/2 inches)
1
Locknut (3/4 inch)
1
Short spacer
2
Bolt (5/16 x 1 inch)
4
Flange locknut (5/16 inch)
4
Install the rake to the machine.
3