background image

DXR-GO Switch Installation, Operation & Maintenance 

502.969.8000 

Switch Calibration Procedure

 

Never perform switch calibration procedure while area is known to be  
hazardous. 
 
For Intrinsically Safe models, unit must be wired in accordance to Control 
Drawing  
S-K094/094A. Or, for standard explosion-proof models: 
Calibration may be performed using a Volt-Ohm meter by using the Ohm setting 
across COM and NO. When switch is active, the meter will read <0.5 Ohms, or 
the Diode setting may used simply to indicate continuity. 
 
If a 120Vac source is used, an appropriately sized resistor must be used in 
series to limit current to a maximum of 15 Amperes when circuit rating is un-
known, or permanent damage may occur. 
 
Step 1: With valve in the CLOSED position. Push down and slide target magnet 
#1  until SW1 activates. Release the target magnet to lock the position. 
 
Step 2: Rotate valve to the OPEN position. Push down and slide target magnet 
#3  until SW3 activates. Release the target magnet to lock the position. 
 
Step 3: Cycle valve CLOSED and OPEN several times to insure switches will 
maintain calibration. 

 

For Reverse Acting Actuators:

 

 
Step 1: Loosen the 6-32 x .25 set screw on the target disk and lift up on the 
target disk enought to disengage the locator pin.   
 
Step 2: While holding the shaft from turning, rotate the target disk 90 Degrees 
counter-clockwise.  Push down on the target disk until the locator pin engages. 
 
Step 3: Tighten the set screw to 40 in/oz. 
  
Step 4:  Perform steps 1-3 above. 
 
Note: For other valve configurations the target disk can be moved in 90 degree 
increments to adapt to the application.  L4 units are adjusted per application. 

Illustration #6 : GO Switch Assembly 

35 Series GO Switch 
3A/24VDC, 4A/120VAC 
Hermetically Sealed 

MODEL#      

DXP-L1                

SW1  

DXP-L2              

SW1 & SW3 

DXP-L3              

SW1 - SW3 

SWITCHES 

DXP-L4              

SW1 - SW4 

1

2

3

Each target is set by:

Push Down, Slide & Release

NOTE: If target disk is removed

for switch maintenance, align

disk slot to pin on shaft.

Illustration #7 : Push Set Target Assembly 

Summary of Contents for DXR-GO

Page 1: ... C D Class II Div 2 Groups F G Ex e IIC T4 II 2 GD Ex em IIC T4 II 2 GD General Purpose Type 4 4X SPDT Contact Switches Integral Solenoid Pilot Valve 24VDC 110Vac and Intrinsically Safe 3300 Fern Valley Road Louisville Kentucky 40213 USA www topworx com 502 969 8000 phone 502 969 5911 fax info topworx com Table of Contents 2 Outline Dimensions 2 Indicator Assembly 3 DXP Enclosure Assembly 4 Spool ...

Page 2: ...ing of the mounting kit hardware This allows the shaft to self center in the pinion slot or coupler 3 Always use sound mechanical practices when torquing down any hardware or making pneumatic connections 4 This product comes shipped with plastic plugs in the conduit entries in an effort to protect the internal components from debris during shipment and handling It is the responsibility of the rece...

Page 3: ...EPDM Viton Conduit Entries 2 1 2 NPT resin 2 3 4 NPT resin 2 1 2 NPT 316 Stainless Steel 2 3 4 NPT 316 Stainless Steel 2 M20 resin 2 M25 resin 4 M20 2X 316 Stainless Steel 2X resin Mounting Holes 4X 5 16 18 UNC tapped holes on 2 25 57 15 mm Square Pattern Optional F05 Pattern Max Torque Values for Fasteners Description Max Torque Value Enclosure Lid Screws 10 in lbs Indicator Dome Screws 320 in oz...

Page 4: ...una N Silicone EPDM Viton ColdTemp Spools are lap joint technology containing no seals Pneumatic Hookup Procedures Prior to connecting the supply air to the spool valve flush the system to remove any debris or contaminates Galvanized pipe can easily flake and contaminate the system and therefore is not recommended A 40 micron point of use filter at every device is recommended 4 Way Spool Valves Th...

Page 5: ...ed Apps x2 for Fail Last Position Block Center Apps Illustration 5 Pilot Device Assembly Fail Closed Spool Valve Replacement Assemblies AV BFCVA20 Std Alum Spool Valve Assy w Buna seals AV BFCVS20 Std 304SS Spool Valve Assy w Buna seals AV BFCV620 Std 316SS Spool Valve Assy w Buna seals Fail Last Position Spool Valve Replacement Assemblies AV BFLPVA20 Std Alum Spool Valve Assy w Buna seals AV BFLP...

Page 6: ...n Push down and slide target magnet 3 until SW3 activates Release the target magnet to lock the position Step 3 Cycle valve CLOSED and OPEN several times to insure switches will maintain calibration For Reverse Acting Actuators Step 1 Loosen the 6 32 x 25 set screw on the target disk and lift up on the target disk enought to disengage the locator pin Step 2 While holding the shaft from turning rot...

Page 7: ...rranty being limited to making good at its factory and part of parts thereof which shall be returned to it with transportation charges prepaid within one year after the date of the purchase of such equipment by the original purchaser and which its examination shall disclose to its satisfaction to have been thus defec tive TopWorx however assumes no risk or liability for results of the use of the p...

Page 8: ...quiries contact TopWorx at 502 969 8000 www topworx com info topworx com About TopWorx TopWorx is the leader in field networking valve control and position sensing solutions for the process industries Our products and services help plants mills and pipelines improve their performance by making it easy to implement modern automation technologies 3300 Fern Valley Road Louisville Kentucky 40213 USA 5...

Reviews: