Step 7
: Complete installation by attaching out guy
ropes or ratchet straps to the connecting points on
the corner brackets. Fasten velcro over corners to
cover webbing. Secure them to appropriate sized
stakes. Pull cam buckle straps completely tight to
fully tension the top. Make sure all legs are straight
and center pole is plumb. Center pole can be
adjusted by pulling on base.
Step 8
: Installed Tent Inspection
1.
Staking - Check all stakes for signs of movement.
2.
Tensioning - Check all ropes for proper tension and make sure that the tent top is set
for proper drainage.
3.
Poles - Check that all poles are properly aligned, securely tied and structurally sound.
4.
Sidewalls - Check that they are properly secured as needed.
5.
Special Considerations - Make sure that the installation is in compliance with all local
building, fire and public safety codes.
During inclement weather, particularly when the tent is in use, experienced tent
personnel should be present to ensure the security of the equipment and those
using it. All parties must be aware of the limitations for safe occupancy of the
tent. The tent renter must retain the right to declare the tent unsafe for
occupancy. Always follow manufacturer's instructions and warnings as they take
precedence over any conflicting information contained in these instructions.
Sierra Hexagonal Tent Installation Instructions
Form # 20040813
Sierra Hex