
Topsoaring New Technology Co., LTD
Top Sky DLG Install Guide
TopskyInstallGuide-(English version).doc
Page 18 of 40
2.15.
Drill 4mm screw holes. Trim the wing screw holes and make them centered to the screw holes on
the fuselage. Then enlarge the holes with 6mm drill.
2.16.
Insert the 2 short carbon pipes into the wing screw holes, and assemble the wing onto the
fuselage.
2.17.
Put on the tail boom, and make sure the wing is vertical to the center line of the fuselage. Check
the length between the wing tips to the vertical tail. Both sides should be the same. Trim the
screw holes if not.
2.18.
Cover the screw holes on the fuselage with tape.