3:4 Once the rig tension has been applied, the forestay can be moved back
from the bar at the front and then tied off to the mast.
3:5 Tie the jib sheets onto the eye on the clew of the jib.
3:6 Furl the jib by pulling the thin line, so that it ends in this position.
3:7 Cleat the jib furler off in this cleat underneath the crossbeam.
7