12
6
. Sign the bolt-hole point on the gate post and gate. Do this by placing a
punch or a sign in the middle of each bolt slot on the post bracket and the
gate bracket. It allows slight adjustments to the post bracket. Then remove
the opener and brackets assy. by taking off the C-clamps.
7.
Drill 10.5 mm diameter holes through the post and the gate at the
marked locations.
8.
Attach the post bracket assemblies to the gate posts by inserting M10 x
200 bolts through each post bracket assembly and the drilled holes in the
gate post. Fasten each bolt with one
¢
10 washer, one
¢
10 lock washer,
and one
¢
10 nut.
9.
Attach the gate brackets to each gate by inserting two M10 x 75 bolts
through the gate brackets and the drilled holes in the gates. Fasten each
bolt with one
¢
10 lock washer, and one
¢
10 nut.
10.
Cut off any part of the bolts that extend beyond the tightened nuts.
11.
With the gate opener fully retracted and with the gate in the fully closed position (for Push-to-Open
installation), attach the gate opener to the Post Bracket Assembly and the Gate Bracket by inserting a clevis pin
through the gate opener and the PSO part and insert another clevis pin through the gate opener and the Gate
Bracket. Secure each clevis pin with a hairpin clip.
Summary of Contents for KD902
Page 6: ...3 KD902 Parts List Accessories Parts Included in some models refers to the actual package...
Page 18: ...15 Connecting of the Control Board...
Page 28: ...25 Quick Setting Guide...
Page 29: ...26...
Page 30: ...27...
Page 31: ...28...