10
1.3.4 How to Turn On/Off the Power
To turn on the power, tilt the power switch rightward.
When the power is ON, the initial screen appears on the LC display unit. After the maintenance
recommendation screen appears, the measured data is indicated last.
Display of the maintenance recommendation screen:
☞
“1.4 Maintenance Recommendation Display”.
Remember
After turning on the power, perform warm-up for at least 40 minutes.
***
Start
SR-NIR***
Maintenance Last Time
n months passed
.
***
Please Wait
***
System Check Running.
#10
AUTO
ABS
2.0
[
f1
] 2
.0
600nm
=
1.4468E+02
1030nm=
2.4466E+02
Measuring angle when
the displayed data was
measured
Spectral radiance
Spectral radiance
When displayed
with two lines
“System check is being
executed” screen
Maintenance
recommendation screen
ON
→
FUNCTION
SHIFT
LAMP
FIELD
DIF.
DC IN
POWER