![Topcon Positioning Group NORAC UC5 Installation Manual Download Page 7](http://html.mh-extra.com/html/topcon-positioning-group/norac-uc5/norac-uc5_installation-manual_1128766007.webp)
5
2.3
Switch Box Installation
1.
Disconnect cable C20 (
Thru 2
connector) from the input module (E03). Remove the wedge
from the face of the 12-pin Deutsch plug. The wedge is removed by inserting a small flat
implement underneath the wedge and lifting it up.
2.
Insert the Roll CW pin from C26 into position 3 of the 12-pin plug on C20. Insert the Roll
CCW pin from C26 into position 4 of the 12-pin plug on C20. Insert the wedge back into
the plug. Connect C20 to the
Thru 2
connector on the input module.
3.
Connect the 12-pin Deutsch plug on C26 to the
OEM 3
connector on the input module.
Route the other end of the cable to the cab.
4.
Attach the switch box (C25) inside the cab and connect it to cable C26.
* Some sprayer types may not use all the switch functions.
* Refer to “Appendix A” for sprayers with European style slant control.
Figure 2: Switch Box Installation
Summary of Contents for NORAC UC5
Page 1: ...Topcon X25 X30 X35 Display Kit Installation Manual 54VT TC X30 ...
Page 8: ...6 3 Cable Drawings 3 1 Item C25 50250 Switchbox ...
Page 9: ...7 3 2 Item C26 43240 47 Cable UC5 Interface Switch Box 50250 ...
Page 10: ...8 3 3 Item C40 1015764 01 Cable Topcon X25 X30 Cab Interface ...
Page 11: ...9 3 4 Item C41 1015765 01 Cable Topcon CM 40 Interface ...