Integral Promotional Serve Over - Akdeniz
12.1.7 Water Outlets:
Outlets for waste water should be cleaned
regularly to ensure a continious flow of waste
water.
12.2 Housekeeping Routines:
12.2.1 Close of Business:
Cases should not be switched off at close of business or overnight.If your princible is moving
of the merchandises to the cold room at the end of the day,switch off the case.But, do not
load the merchandises again without getting enough refrigeration in the case.
12.2.2 Case Inspection:
Operating temperature, as indicate on the controller
mounted in front of the case,should be checked on
dialy basis.
Case should be monitored on a daily basis for any
undue noise, smell or malfunction.
Regularly inspect the case for ice cream spillage or debris in the air grilles and case well.
Remove and clean spillages and debris.
12.2.3 Cleaning of the Condenser unit:
Ensure that the condensing unit is switched off and if
possible disconnected from the main power supply.
Carefully vacuum dust and air borne debris from the
condenser fins.
Exercise care not to damage fins.
Summary of Contents for ISLA
Page 5: ...Integral Promotional Serve Over Akdeniz 3 Sectional Drawings ...
Page 21: ...Integral Promotional Serve Over Akdeniz 15 Troubleshooting ...
Page 22: ...Integral Promotional Serve Over Akdeniz 16 Electrical Wiring Diagram for Akdeniz ...
Page 23: ...Integral Promotional Serve Over Akdeniz 17 Declaration of Conformity ...