background image

1.5
The block for the jib halyard 
should line up with the cut out 
on the luff tube. Pass one end 
of the jib halyard through 
the deckeye, and pull it 
towards the bottom 
of the mast.

1.6
Lead the Jib Halyard to 
the other cleat on the mast 
and pass it through to secure it.
The other end of the halyard 
will be attached to the jib 
when it is rigged.

1.7
Open the mast gate. 
Place the bottom of the mast 
in the mast foot and lift the mast
up until it is vertical. 
Once the mast is up close 
the mast gate and ensure 
the pin is fully down.

1.8
Wrap the sail up clockwise, 
so that the hook in the corner 
is on the outside. 
Once the sail is wrapped up,
place the white loop on the hook
to hold the sail wrapped up while
the rest of the boat is rigged.

5

Summary of Contents for Uno Plus

Page 1: ...www toppersailboats com TOPAZ Uno Plus Rigging Instructions...

Page 2: ...f with the craft before using it If this is your first craft or you are changing to a type of craft you are not familiar with for your own comfort and safety please ensure that you obtain handling and...

Page 3: ...when down Any movement between the blade and the stock or the stock and the hull may cause steering problems Hull and fittings Small dents can be repaired by gently warming the hull with a hot air bl...

Page 4: ...ted so that it is a snug fit 1 3 Slide the luff tube of the sail front edge over the mast until the end of the mast reaches the end of the luff tube 1 4 Tie the downhaul onto the pre attached cleat on...

Page 5: ...The other end of the halyard will be attached to the jib when it is rigged 1 7 Open the mast gate Place the bottom of the mast in the mast foot and lift the mast up until it is vertical Once the mast...

Page 6: ...boom 2 3 Take the free end of the outhaul towards the mast end of the boom and pass it through the cleat on the top of the boom Then pass the free end through the block on the mast end of the boom nex...

Page 7: ...end of the kicker onto the metal ring at the bottom of the mast 2 7 Unwrap the sail and place the hook on the end of the boom through the metal ring in the clew of the sail 2 8 Pull the length of outh...

Page 8: ...pulley on the boom back to front and then the main pulley on the boat front to back Finally feed the pulley through the cleat on the mainsheet block 2 10 Tie a couple of figure eight knots in the main...

Page 9: ...he jib is all the way up and the luff front edge is taut To secure the halyard pass it through the cleat on the mast as shown To keep the line tidy tuck the loose halyard into the pocket hidden behind...

Page 10: ...10 3 5 Pass the jib sheets through the cleats on the sides of the boat as shown 3 6 A Fisherman s bend can be used to join the two ends of the jib sheets together 3 Rigging the Jib continued...

Page 11: ...the pins on the back of the boat and the rudder to attach It will be reasonably stiff from new so rotating the rudder while applying a gentle downward pressure can help 4 3 The rudder on the Topaz can...

Page 12: ...ational Ltd Kingsnorth Technology Park Wotton Road Ashford Kent TN23 6LN Tel 01233 629186 Fax 01233 645897 email info toppersailboats com TOPAZ UNO RIGGING INSTRUCTIONS PART No ISSUE 1 2016 www topper...

Reviews: