STEP 3:
1. Insert the shaft (27) through the handlebar post (2), put on the wave washer (54) and
then insert the left swing tube(6L) to the left side of shaft (27). At last, fix it with flat
washer (25), spring washer (52) and hex bolt (24).
Note: Please don’t tighten them for now.
2. Attach the left pedal support (5L) to the left crank (22) with left hinge bolt (38L), wave
washer (45), spring washer (41) and nylon nut (42L).
Note: Please don’t tighten them for now.
3. Attach the left swing tube (6L) to the left pedal support (5L) with bushing (30), flat
washer (25),spring washer (52) and inner hex screw (16). Then tighten the hex bolt
(24), inner hex bolt (16) and left nylon nut (42L). At last, cover the caps (23, 43 & 36).
4. Repeat the above steps to assembly the right side.
5. Tighten the pedals (10L/R) to the pedal supports (5L/R) with hex bolts (33), flat
washers (34) and nylon nuts (35).