16
Operating
manual
BTW 6/12 V
Translation of the original
instructions
ALTERNATOR TEST
Testing the battery charging system.
Do not switch off the engine during
the load test.
Share the battery test report
At any time during a test,
touch to access the sha-
ring window.
The results of the test can
then be shared by email:
- as a screenshot.
- in text format.
You can share all test reports by selecting
«Setting» and then «Share Report».
Summary of Contents for BTW 12 V
Page 34: ...34 BTW 6 12 V CCA 4 5 16 40 80 C 40 170 F IP65...
Page 35: ...RU 35 BTW 6 12 V QR Bluetooth KonNwei...
Page 36: ...36 BTW 6 12 V 4 5 2 3 4 1 1 2 AGM AGM GEL 3...
Page 37: ...RU 37 BTW 6 12 V 4 CCA 10 2000 5 TEST...
Page 38: ...38 BTW 6 12 V 4 1 2 CCA 3 4 1 4 2 3...
Page 39: ...RU 39 BTW 6 12 V...
Page 40: ...40 BTW 6 12 V...
Page 41: ...RU 41 BTW 6 12 V 2...