- 24 -
7
7
7
7.
.
.
.OPERATING PROCEDURE
OPERATING PROCEDURE
OPERATING PROCEDURE
OPERATING PROCEDURE
1.Tightening Operation
① Set the change lever to
“
R
”
(clockwise)
position.
② Adjust torque setting dial to target torque
with attached (-) driver.
※ Graduations are just a guidance.
When minute torque control is necessary, confirm
torque with torque wrench.
③ Slide impact socket over nut completely
by turning internal gear.
※ When the wrench starts, reaction bar turns in the
direction opposite to the rotation of nut.
④ Squeeze trigger switch to start.
Reaction bar stops at adjacent material
and tightening starts.
※
GREEN LED keeps going ON and OFF after
beginning of tightening operation until automatic
shut-off.
⑤
When
the
target
torque
is
reached,
the wrench shuts off automatically.
※
After normal-end, GREEN LED remains ON and
the wrench remains READY for
next operation
※
Do not release the trigger switch during
tightening operation. The target torque is not
reached.
※ In case that RED LED goes ON and OFF during tightening operation ④&⑤ above, any
troubles happen on the wrench. (See Page 29)
Summary of Contents for STC50AE
Page 20: ... 19 External Dimensions ...
Page 34: ... 33 MEMO ...
Page 35: ... 34 MEMO ...
Page 36: ...IMKA050 ...