ー 19 ー
4. FLOW OF OPERATION
1. Turning ON the power supply switch
2. Checking the pressure gauge
3. Checking the volume of water in the exhaust bottle
4. Checking sterilizing water
5. Placing articles to be sterilized
6. Setting operating conditions
7. Starting operation
8. Operation completion
9. Removing sterilized articles
10. Draining sterilizing water
11. Turning OFF the power supply switch
Connect the power plug to the proper
outlet. Be sure to provide protective
grounding.
Be sure to provide protective grounding
to the grounding terminal in case of the
power supply connection without power
plug.
<
sample
>
①
②
16A / 250V
※
When operating the autoclave repeatedly, restart operation from “Checking the pressure gauge”
after carrying out “Removing sterilized articles”.
Summary of Contents for SX-300E
Page 57: ...ー 56 ー ...
Page 58: ...ー 57 ー MARKINGS FOR DIRECTIVE 2014 68 EU PED Nameplate figure ...
Page 59: ...ー 58 ー MEMO ...