
IS0802-00
11-08-18
Note: 1. Dip switches will override any external wire connections made.
Note: 2. If the blue and yellow wires are not used cut off or cap with a wire nut.
TABLE 2
Internal Dip Switch Settings for setting modes of operation
Switch 1
Switch 2
Mode
On
Off
Single flash 2 380mS On, 380ms Off
Off
On
Double flash @200mS On, @00mS On, 900mS Off
On
On
Off
Off
Off
Steady Burn PWM @ 66.4%
External Wire Connections for setting modes of operation
Yellow
Blue
Mode
Line
Neutral
Single flash 2 380mS On, 380ms Off
Neutral
Line
Double flash @200mS On, @00mS On, 900mS Off
Line
Line
Off
Neutral
Neutral
Steady Burn PWM @ 66.4%
Notes: yellow and blue wires can also be connected to PLC controller for mode
activation. For a PLC the input voltage can be either be AC or DC, but must be greater
than 10 volts RMS and no more than 24 volts RMS
8.
Replace the LED light engine assembly and attach 2 screws.
9.
Secure the dome to the base of the beacon.
10.
Connect power to the beacon and test it for proper operation