Page
5
of
9
Step 2 : Assemble all trusses
The shelter includes 8 trusses, connect all tubes with bolt (#12) (Figure 2).
Parts used on this step :
-
(1x8) Peak arch tube (#1)
-
(2x8) Middle bent tube (#2)
-
(2x8) Lower bent tube ( #3)
-
(1x8) Ceiling cross bar (#7)
-
(2x8) Hex bolt M10x20 and nut (#13)
-
(8x8) Hex bolt M8x60 and nut (#12)
Figure 2
Lay down all (8) trusses on the ground as Figure 3 when the assembly is all
completed and before moving to next step.
Figure 3
Summary of Contents for TMG-203012PST
Page 1: ...Page 0 of 9...