Installation steps 

Step 1 : Review the whole structure and choose the proper installation site 
 

Choose a solid flat level ground area to set up the building. Do not install the building on 
soft ground, wetland, uneven surfaces, sloped surfaces, or on top of structures that are not 
rated to hold its weight. 

 

We strongly recommend that you build the structure on a solid foundation such as   
cement and use anchor bolts on all baseplates. 

 

Be aware of the surrounding area. Do not set up the building near snowdrifts, open flames 
or exposed electrical wires. Do not keep heat sources near the fabric cover. Keep the 
building surroundings clear at all times. 

 

 

Mark the ground in the final building location with a line showing the positions of 
base plates, front, and rear doors. All lines should be drawn from center to center of 
all baseplate tubes. Diagonal line X must be equal to Y. 

 

Baseplates: all baseplates must be installed firmly with expansion bolts (#10) 
on this step (Figure 1). 

 

Parts used in this step : 

-

 

(4) Baseplates (#7L,7R) 

-

 

(12) Baseplates (#8) 

-

 

(48) Expansion bolts M12 (#10) 

                     

 

Figure 1 

Summary of Contents for TMG-203012PST

Page 1: ...Page 0 of 9...

Page 2: ...marked with a part number please refer to the parts list to make sure you have all parts Choose a day with low or no wind to install assembly is hard in heavy wind Do not make any alterations to the...

Page 3: ...16 1 1 3 Lower bent tube 16 1 1 4 Roof purlin horizontal tube 35 1 1 5 Bottom tension tube for both long bottom sides 14 1 1 6 Diagonal bracing bar 2 1 1 7 Ceiling cross bar 8 1 1 7L Left corner base...

Page 4: ...10 Expansion bolt M12x100mm Not included 48 1 1 11 Half round head bolt M8x70mm 40 1 1 12 Hex bolt M8x60mm 96 1 1 13 Hex bolt M10x20mm 44 1 1 14 Top cover panel 1 1 1 15 Front and rear cover panel 2 1...

Page 5: ...lates Be aware of the surrounding area Do not set up the building near snowdrifts open flames or exposed electrical wires Do not keep heat sources near the fabric cover Keep the building surroundings...

Page 6: ...2 Parts used on this step 1x8 Peak arch tube 1 2x8 Middle bent tube 2 2x8 Lower bent tube 3 1x8 Ceiling cross bar 7 2x8 Hex bolt M10x20 and nut 13 8x8 Hex bolt M8x60 and nut 12 Figure 2 Lay down all 8...

Page 7: ...e the truss will stay upright and use bolt 12 to connect the truss to the baseplate on both sides Figure 4 4 Hex bolt M8x60 and nut 12 Figure 4 Step 4 Put up the rest trusses Refer to step 3 to put up...

Page 8: ...all the diagonal bracing bars 6 on the 1st span Connect diagonal bracing bar 6 with tube clamp 9 and bolt 13 on the first span as Figure 6 below Parts used in this step 4 Tube clamps 9 2 Diagonal brac...

Page 9: ...t the same step to install the rear truss panel Figure 7 Figure 7 Step 7 Install the top cover 14 Do not install the cover during windy weather Unpack the top cover and place it along one of the long...

Page 10: ...ection points to make sure they are all in good position Check the base plates adjust the ropes and tie downs if required and clean the cover regularly Snow accumulating on the fabric cover must be re...

Reviews:

Related manuals for TMG-203012PST