Installation of the unit 

 

 

Make sure that the installation surface can support at least four times the weight of 
the unit in normal operating conditions. In case of excessive external stress 
(vibration, strong winds or impact, for example), the equipment may need 
additional means of protection. 
Proper stainless-steel hardware (grade A4 or 316) should be carefully chosen to 
fasten the unit to the surfaces. Proper tools should be used during the installation, 
in accordance to environmental requirements.  
Dome covers should be opened only by the manufacturer. 

Electrical connections (such as plugs and cords) must be protected from potential 
hazardous environmental factors (e.g. foot traffic, hitting objects). 
Pointing the camera at the sun may damage it. 
Complete the installation performing the camera connection referring to the 
manual of the camera. 
Carefully check the supply voltage marked on the label. An incorrect power supply 
voltage may damage the unit. Do not overload the terminal connection, as it may 
cause a fire or electrical shock hazard. 

 
 
 

To protect the installation for overcurrent, install a delayed fuse T (Time delay) of 
at least 4 A or fuse of 10 A max. Or equivalent resettable devices such as 
magnetothermal fuses. These ratings include inrush current for startup or 
temporary overload. It must be very quickly recognizable and readily accessible.  
For connection to the 24Vac use a multipolar cable having minimum 3x1,5 mm

2

 

(15 AWG). The mains cable must be protected. 
An all-pole mains switch with an opening distance between the contacts at least 3 
mm in each pole must be incorporated in the electrical installation. 
Make sure that the unit case is properly earthed. The Protective Earth (PE) 
connection is included in the 3p or 5p power connector. The minimum wire size is 
2.5 mm

2

 copper stranded wire. 

Fasten all the cables inside the housing with cables ties or other fixing means to 
avoid the electrical contact with surrounding parts in case cables get loose. 
Do not connect the unit to a supply circuit unless the installation is completed 

 

To maintain the certification requirements and the IP rating of the unit, adequate 
certified cable glands must be used. Each unused cable gland hole must be 
closed using a proper plug suitable for the housing marking. 
Check the proper position of the O-ring seals in their groove 
Keep the unit tightly closed when operating. 
Disconnect the equipment from the supply circuit and wait at least five minutes 
before opening. 

Summary of Contents for INT-MM

Page 1: ...TKH TKH Security Siqura EX PD24 Installation manual 1 INT RJ SM MM Installation manual ...

Page 2: ...s We invite you to offer your suggestions and comments by email via info tkhsecurity com Your feedback will help us to further improve our documentation How to contact us If you have any comments or queries concerning any aspect related to the product do not hesitate to contact TKH Security B V Meridiaan 32 2801 DA Gouda Used electrical electronic and stainless steel products should not be mixed w...

Page 3: ...n manual v2 3 Contents Contents 3 Description 4 Safe Area SA camera housing 4 Hazardous Area Ex camera housing 4 Before you continue 5 Installation of the unit 6 Installation instruction 7 INT RJ INT SM INT MM 7 INT RJ5 INT RJ10 7 INT SM5 INT SM10 8 ...

Page 4: ...le with an external cable tail Hazardous Area Ex camera housing The Atex or EX camera housings require a pre installed cable tail The INT RJ5 or INT RJ10 define a EX cable tail for 100 Mb Fast Ethernet of 5 or 10 meter INT SM5 or INT SM10 defines a single mode connection with a 5 or 10 meter multicable and INT MM similar for multi mode The cable is terminated by two Ex d barrier glands on both sid...

Page 5: ... must be tightly closed when operating Open only the covers pointed out in this installation manual Other covers should be open only by the manufacturer For security reasons install the unit out of the reach of children For security reasons do not install the unit in the proximity of water containers and never push objects or pour liquids into the unit The unit can be safely used in damp environme...

Page 6: ...ed fuse T Time delay of at least 4 A or fuse of 10 A max Or equivalent resettable devices such as magnetothermal fuses These ratings include inrush current for startup or temporary overload It must be very quickly recognizable and readily accessible For connection to the 24Vac use a multipolar cable having minimum 3x1 5 mm2 15 AWG The mains cable must be protected An all pole mains switch with an ...

Page 7: ...curity Siqura EX PD24 Installation manual 7 Installation instruction INT RJ INT SM INT MM The interfaces are located in the camera Refer to the camera s installation manual for more information Cable glands and cable are not included INT RJ5 INT RJ10 ...

Page 8: ...ected 5 2x 50 m 125 m OM2 Not terminated Spare fibers The two unterminated SM fibers can be used as spare if one of the originals breaks or gets serious damaged Inside the camera and at the end of the cable the spare pigtails have 30 cm to 50 cm slack respectively When one of the original fibers are damaged specialized and trained personnel can terminate the cable with the SC optical fiber connect...

Page 9: ...lation manual 9 INT MM5 INT MM10 1 3x 1 5mm2 Black1 N Black2 L Yellow green PE 2 4x 2x 0 53 mm Cat 6A F UTP Black Not Connected 3 2x 2x 0 22 mm FTP a Grey jacket Washer control 24Vac b Black jacket Not connected 4 4x 9 m 125 m OS1 Not connected 5 2x 50 m 125 m OM2 Terminated with SC ...

Page 10: ...TKH Security Proposal RFP Name RFP Number TKH Security Siqura INT RJ INT SM Installation manual 10 Our Brands 2020 TKH Security tkhsecurity com 2021 TKH Security B V Our Brands ...

Reviews: