background image

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

TM

N

CO

V EYORS

7/21

4

INTRODUCTION

 

The management and employees of Titan Industries thank you for specifying Titan equipment. This manual will  give 

 

you the basic information to install and maintain your equipment. If special circumstances or questions come up 

 

call Titan at 920-982-6600.

I.  RECEIVING

 

 

Upon delivery of your Titan conveyor, check the packing slip or bill of lading accompanying the unit. If any 

 

components are missing, contact Titan IMMEDIATELY with a description of the missing components along with 

 

the conveyor serial number(s). The serial number is found on the serial plate normally positioned by the  

drive.

 

Check the unit(s) over carefully upon arrival for damage. If you find any damage note it on the bill of lading. 

 

YOU MUST

 also file a claim 

IMMEDIATELY

 with the carrier.

II.  INSTALLATION

 

 

WEAR SAFETY GLASSES, SAFETY SHOES, AND GLOVES.

 

 

 

 

 

 

HAVE AREA AROUND INSTALLATION SITE CLEARED OF DEBRIS.

 

 

 

 

 

 

LOCKOUT POWER TO CONVEYOR(S) UNTIL START-UP.

 

 

 

 

 

 

LOOK OUT FOR SHARP EDGES WHILE HANDLING CONVEYOR COMPONENTS.

 

 

BE CAREFUL IN AND AROUND THE CONVEYOR(S) DURING INSTALLATION.     

 

 

 

 

ALSO, BE AWARE OF OTHERS IN THE AREA.

 

 

ONLY ALLOW QUALIFIED PERSONNEL TO ASSEMBLE AND INSTALL CONVEYORS.

FRAME ASSEMBLY  

If the frame and belt have been shipped "knocked down" use the following information to aid in assembly.

1.  If the conveyor is not to be put into use immediately, oil the belt liberally and store along with the frame in a

 

dry location.

2.  Layout a line on the floor to represent the centerline of the conveyor.  As frame sections are bolted together make 

 

sure they remain centered on the line.

3.  Bolt together conveyor frames finger tight with the fasteners provided. Make sure that the tracks, which the belt 

 

rides on, are lined up and level to ensure a smooth transition from one section to the next.  

 

(Weld tracks and grind smooth for best results.)

NOTE:  If several sections of frame are to be joined in a particular sequence, they will be factory 

 

       matched marked.  See 

FIGURE 1

.

Go to Table of Contents

Summary of Contents for IMPACT 640

Page 1: ...982 6600 800 558 3616 FAX 920 982 7750 E mail sales titanconveyors com Website www titanconveyors com Serial No MODEL 640 Hinged Steel Belt Conveyor to View the Instructional Videos Installing a Hinge...

Page 2: ...harges for correction of defects by others will not be acceptable unless so authorized in writing prior to the work being performed by an officer of the company Damage caused by deterioration due to e...

Page 3: ...to avoid electrical shock NEVER climb sit walk or ride on conveyor ALWAYS keep hands away from conveyor while moving ALWAYS keep hair and loose clothing away WARNING KEEP AWAY Moving equipment can ca...

Page 4: ...for damage If you find any damage note it on the bill of lading YOU MUST also file a claim IMMEDIATELY with the carrier II INSTALLATION WEAR SAFETY GLASSES SAFETY SHOES AND GLOVES HAVE AREA AROUND INS...

Page 5: ...YORS 7 21 5 SUPPORT ASSEMBLY Standard heavy duty supports are always shipped assembled See FIGURE 2 for component breakdown IT IS THE CUSTOMERS RESPONSIBILITY TO LAG THE SUPPORTS TO THE FLOOR AFTER TH...

Page 6: ...thly Look for and remove any foreign objects nuts bolts tools etc from the frame and tracks BELT INSTALLATION to View the Instructional Videos Installing a Hinged Steel Belt Conveyor https youtu be Hl...

Page 7: ...the frame to allow for connection of the next section of belt 4 When the belt is fed around the infeed sprockets make sure the belt rollers remain tight against the sprocket teeth as feeding continues...

Page 8: ...e watch how thebelt is tracking If the belt is running off to one side loosen the bearing on the drive end on that side and with the pusher bolt provided See FIGURE 4 move the driveplate out slightly...

Page 9: ...n the motor nameplate 4 LUBRICATION Most electric motors are lubricated for life and under normal conditions require no more lubrication Under severe conditions where additional lubrication is require...

Page 10: ...ears Too much oil can cause overheating seal deterioration and leakage FIGURE 5 CAUTION SIDEMILL MOTOR SHAFT BORE REDUCER KEYSEAT CUT MOTOR SHAFT 1 3 NO IF MOTOR SHAFT HAS A KEYSEAT MADE BY AN ENDMILL...

Page 11: ...oil Use the chart below Shut off conveyor before removing guards to apply oil REMEMBER ALL GUARDS AND BOTTOM PANS IF PROVIDED MUST BE REPLACED BEFORE RUNNING CONVEYOR TITAN INDUSTRIES IS NOT RESPONSI...

Page 12: ...and or file Clean off metal particles and dirt from the shaft and sheave before installation 2 Sheaves must be in line with each other and installed on shafts which are parallel with each other 3 DO...

Page 13: ...1 OUTSIDE SIDEBAR D HOLE 2 OUTSIDE SIDEBAR ROUND HOLE 3 2 DIA SINGLE FLANGE ROLLER 4 SIDEWING R H OLD STYLE 5 SIDEWING R H NEW STYLE 6 SIDEWING L H OLD STYLE 7 SIDEWING L H NEW STYLE 8 COTTER PIN 9 A...

Reviews: