PR33/DPZ-L
32 / 63
4
4
Upon completion of the seal deposit the locking
device and tilt the jack, as shown in the photo,
upwards until the steel strap breaks before the
sealing sleeve.
Again, the air supply must not be stopped.
Then, turn off the air feed and separate the
tension jack from the steel strap again by
pressing the lever.
5
5
Sketch
Course of strap
The following picture shows a correctly carved seal.
Check the seals regular
for crackings on the sleeve and
for neat cutting edges.
H365 EU 24/12
Summary of Contents for DPZ-L
Page 14: ...PR33 DPZ L 14 63 8 Konformit tserkl rungen H365 EU 39 12...
Page 15: ...PR33 DPZ L 15 63 H365 EU 24 12...
Page 34: ...PR33 DPZ L 34 63 8 Declarations of conformity of the machinery H365 EU 39 12...
Page 35: ...PR33 DPZ L 35 63 H365 EU 07 10 H365 EU 24 12...
Page 54: ...PR33 DPZ L 54 63 8 D claration de conformit H365 EU 39 12...
Page 55: ...PR33 DPZ L 55 63 H365 EU 24 12...