
Size
А4
ROAD BLOCKING SYSTEMS
Installation and Operation Manual
Revision 1.1 01.2022
Page
-
15
-
MECHANICAL TIRE-KILLER
Size
А4
ROAD BLOCKING SYSTEMS
Installation and Operation Manual
Revision 1.1 01.2022
Page
-
15
-
MECHANICAL TIRE-KILLER
Office and Production site: Tel.: +380 (44) 291-21-11
14 Promyslova str., 02088, Kyiv, Ukraine, Fax: +380 (44) 291-21-02
E-mail: [email protected] www.tiso.global
џ
The road blocker horizontal position and compliance with the design
reference marks shall be checked by builder's level prior to the road blocker
fixation.
General view of the submersible Tyre-Killer road blocker fixation in the design
position (by the example of the two meter long Tyre-Killer):
R.s.l. (±0.000)
320/380
80
80
275
4
SECTION 4 : 4
VIEW C
4
Concrete expansion anchor М16х150
Movement
direction
C
40
Anchor fixation line
Ø
50
4 holes
Ø
22
6 holes
Movement
direction