Size
А4
ROAD BLOCKING SYSTEMS
Installation and Operation Manual
Revision 1.1 01.2022
Page
-
12
-
MECHANICAL TIRE-KILLER
Size
А4
ROAD BLOCKING SYSTEMS
Installation and Operation Manual
Revision 1.1 01.2022
Page
-
12
-
MECHANICAL TIRE-KILLER
Office and Production site: Tel.: +380 (44) 291-21-11
14 Promyslova str., 02088, Kyiv, Ukraine, Fax: +380 (44) 291-21-02
E-mail: [email protected] www.tiso.global
A
B
C
RB 379-16
2080
490
385
RB 379-17
3080
RB 371-07
2080
550
RB 371-08
3080
Layout of the
:
submersible Tyre-Killer road blocker installation well (pit)
А
SECTION 2-2
А
A
75
>100
280
2
B
2
1
2
5
6
4
3
Pit
Drain pipe
џ
It is advised to use a formwork for concrete pouring;
џ
Concreting shall be performed according to the applicable standards;
џ
It is advised to use waterproof additives to obtain water-resistant concrete;
џ
After concrete is dry the formwork to be removed, the road surface around
the road blocker to be restored and the installation area (site) to be
arranged;
џ
Complete drying of concrete foundation takes at least 28 days
.
85
150
10
0
50
R.s.l. (±0.000)
Legend:
1. 50 mm sand cushion ;
2. Geotextile (EN 13256-2009);
3. Drain pipe PVC 75 (EN 1401-1);
4. 10-20mm grain size gravel at the minimum height of 100 mm(BS EN 13043);
5. Concrete layer >150 мм (С25/30 ENV206);
6. Pit.
385
Movement
direction
Table 5. SubmersibleTyre-Killer pit
dimensions
Model
Movement
direction
>100
>100