User Manual-MA2T
Version A August 2021
17 of 25
17
3.
PGMA Installation
Connection
Unless the customer requests to ship separately, all cables will be fixed onto the actuator under the default
installation procedure.
For PGMA settings, it is required to change the short circuit plug or the Reed sensor cable on P2. Either one
needs to be replaced by a TAD1 extension cable.
Extension cable
TAD1
PGMA setting connection
P2