background image

3-3

29084-05   03/17

VERSALIFT   VST-7500-I

SPECIFICA

TIONS

ground clearance and penetration to be determined
at installation.  At maximum extension the outriggers
provide 158 in.  (4.0 m) of spread and from 6 in. to 11
in. (152 mm to 280 mm) of penetration based on a 40
in. (1.02 m) frame height.  Outriggers are equipped
complete with pilot operated check valves, internal
thermal relief valves, and separate operating controls
for each outrigger. A slide pad at each leg ensures
smooth operation.  The standard pivot feet swivel a
minimum of 10° each way.

RADIAL  OUTRIGGERS

  -  Radial  outriggers  are

designed and constructed from high-strength steel.
At 11 in. (0.28 m) of penetration the outriggers provide
211 in. (5.36 m) of spread based on a 40 in. (1.02 m)
frame height.  Outriggers are equipped complete with
pilot operated check valves, internal thermal relief
valves,  and  separate  operating  controls  for  each
outrigger.

OUT AND DOWN OUTRIGGERS

 – Out and down

outriggers are designed and constructed from high-
strength steel and provide 8 in. (200 mm) of penetration
and 195 in. (5.0 m) of spread based on a 40 in. (1.02
m) frame height.  Outriggers are equipped complete
with pilot operated check valves, internal thermal relief
valves,  and  separate  operating  controls  for  each
outrigger.

SUBFRAME

 – The full-length subframe is constructed

of 6 x 8 tubing.  Shear plates are provided to attach to
the chassis frame.

BACKUP PUMP

 - The backup pump is driven by a

DC  motor,  which  is  powered  by  the  truck-engine
battery.  The system is connected in parallel with the
main  pump  and  is  designed  for  non-continuous
operation.  An air cylinder at the upper controls and a
toggle switch at the turret are used to energize the
system.

SECOND SET OF TOOL POWER PORTS

 - A second

set of tool power ports are installed at the platform to
accommodate a second open center tool.

TOOL POWER AT THE GROUND CONTROLS

 - The

hydraulic tools must be open-center.  The tool circuit
provides approximately 6 gpm at engine idle and 10
gpm  with  the  throttle  control  engaged.    The  tool
pressure is 2000 psi (140 Bars)

EXTRA  CONTROL  CIRCUIT

  -  Consists  of  an

additional air cylinder at the platform, toggle switch at
the pedestal, pressure switch in the turret and airline
to the platform.  An additional pass in the collector
ring is required for each control circuit.

CATEGORY  B  DIELECTRIC  TESTING  AND
CERTIFICATION

 - Testing and certification for ANSI

A92.2  Category  B  46  KV  and  below  or  69  KV  is
available.    Aerial  device  may  be  designed  and
configured  for  gloving  work  provided  it  meets  the
requirements per ANSI A92.2 category B.  The test
system includes interior and exterior test bands and
bonding of all interior boom parts at the elbow end of
the upper boom.  The components are wired to a single
external plug.  This option includes vacuum prevention
for all the hydraulic hoses routed through the insulated
booms.

COMPONENTS  TO  ALLOW  CATEGORY  A
CERTIFICATION

 – Consists of interior and exterior

test bands, test band shields, corona ring, sealed
inner boom, aluminum platform liner, and bonding of
boom tip components.  This option allows the customer
to certify unit up to 345 kv per ANSI A92.2 Category
A.  Aerial device may be designed and configured for
gloving work provided it meets the requirements per
ANSI A92.2 category A.  The certification test is to be
provided by the customer after delivery.  This option
includes vacuum prevention for all the hydraulic hoses
routed through the insulated booms.

CATEGORY  D  DIELECTRIC  TESTING  AND
CERTIFICATION - 

Testing and certification for ANSI

A92.2 Category D are available.  These aerial devices
which are designed and manufactured for work in which
the insulating system is not considered as primary
insulation, but secondary.  These aerial devices are
NOT designed for gloving work methods.  They are
rated at voltages of 46kv.

PLATFORM VARIATIONS

:

24 in. x 30 in. (0.61 m x 0.76 m) Closed Fiberglass
Platform

24 in. x 42 in. (0.61 m x 1.07 m) Closed Fiberglass
Platform

PLATFORM COVER

 - Vinyl covers are available for

the platforms.

PLATFORM LINER

 - Platform liners are available for

each of the closed platforms.

LIFTING  EYE

  -  A  lifting  eye  attachment  near  the

knuckle end of the lower boom/compensation link has
a 1500 lbs. (680 kg) maximum capacity.

1000 LBS MANUAL JIB AND WINCH - 

The material

handling jib and winch consists of a winch and a jib
pole that are automatically leveled with the platform.
This jib provides 1000 lbs. jib capacity in any boom
position.

Summary of Contents for VERSALIFT VST-7500-I

Page 1: ...OF TIME MANUFACTURING CO DO NOT ATTEMPT TO OPERATE THIS VERSALIFT UNTIL YOU HAVE READ AND UNDERSTOOD ALL INFORMATION IN BOTH OPERATOR S AND SERVICE MANUALS PROVIDED WITH EACH VERSALIFT MANUAL PART NU...

Page 2: ......

Page 3: ...Manufacturer s satisfaction to have been originally defective Correction of such defects by repair to or supplying of replacements for defective parts shall constitute fulfillment of all obligations...

Page 4: ......

Page 5: ...pecifications Section 3 VST 7500 I General Specifications 3 1 VST 7500 I Option Specifications 3 2 VST 7500 I Dimensional Specifications 3 5 VST 7500 I Vehicle Specifications 3 8 Operation Section 4 P...

Page 6: ......

Page 7: ...personnel at work stations above the ground This aerial device as manufactured meets or exceeds all applicableANSI A92 2 Full controls at the platform and complete freedom of boom movements make the...

Page 8: ...1 2 29084 05 03 17 VERSALIFT VST 7500 I INTRODUCTION Figure 1 1 Model VST 7500 I Nomenclature...

Page 9: ...can be protected against only by the exercise of INTELLIGENCE CARE AND COMMON SENSE It is essential to have COMPETENT CAREFUL PERSONNEL TRAINED in the INTENDED USE SAFE OPERATION MAINTENANCE AND SERVI...

Page 10: ...of accidents is greatly dependent upon good judgement and common sense of the operator It is the responsibility of the operator to use the Versalift only when it has been installed and maintained in a...

Page 11: ...2 3 29084 05 03 17 VERSALIFT VST 7500 I RESPONSIBILITIES SAFETY...

Page 12: ...2 4 RESPONSIBILITIES SAFETY 29084 05 03 17 VERSALIFT VST 7500 I...

Page 13: ...2 5 29084 05 03 17 VERSALIFT VST 7500 I RESPONSIBILITIES SAFETY...

Page 14: ...anticipating accidents and operating hazards Then determine a corrective course of action to respond to the situation This habit will sharpen your safety awareness quicken your reaction time and prev...

Page 15: ...line to raise or lower tools to from the platform Stand only on the platform floor Maintain safe clearances from electrical power lines and apparatus The aerial lift does not provide protection from...

Page 16: ...RESPONSIBILITIES SAFETY 29084 05 03 17 VERSALIFT VST 7500 I Don t climb out of a raised platform onto poles etc Keep the fiberglass booms clean and dry Foreign substances on the booms conduct electric...

Page 17: ...hot sticks etc maintain safe approach distances and follow company work practices Area 2 Upper Boom Insulation Section This section provides insulation between the boom tip area and earth ground when...

Page 18: ...ough check of the winch rope for abrasive wear pulled strands cuts and other defects daily 11 Replace the winch rope at the first sign of damage or deterioration Use only non conductive rope of the si...

Page 19: ...glass section and a 10 x 12 steel section The fiberglass section provides a 108 in insulation gap The inner boom can be easily removed and disassembled for service and inspection The extension system...

Page 20: ...ols The tool circuit provides approximately 6 gpm at engine idle and 10 gpm with the throttle control engaged The tool pressure is 2000 psi 140 Bars ELECTRICALINSULATION SPECIFICATIONS The outer inner...

Page 21: ...the platform toggle switch at the pedestal pressure switch in the turret and airline to the platform An additional pass in the collector ring is required for each control circuit CATEGORY B DIELECTRI...

Page 22: ...ib and winch consists of a winch and a jib pole that are automatically leveled with the platform This jib provides from 900 to 2000 lbs jib capacity depending on the boom positions Platform capacity i...

Page 23: ...t 0 in 22 9 m Working Height 80 ft 0 in 24 4 m Stowed Travel Height 12 ft 5 in 3 8 m Weight of Lift without Subframe and Outriggers 8 500 lbs 3850 kg Weight of Lift with standard Subframe and Dual Rad...

Page 24: ...3 6 29084 05 03 17 VERSALIFT VST 7500 I SPECIFICATIONS...

Page 25: ...3 7 29084 05 03 17 VERSALIFT VST 7500 I SPECIFICATIONS...

Page 26: ...Vehicle GAWR Front 13 000 lbs 5900 kg Recommended Vehicle GAWR Rear 20 000 lbs 9070 kg Dual Radial Outriggers with Material Handling Option Approximate Curb Weight for Stability 28 500 lbs 12930 kg R...

Page 27: ...3 9 29084 05 03 17 VERSALIFT VST 7500 I SPECIFICATIONS...

Page 28: ......

Page 29: ...evice OPERATION must be leveled within 2 of horizontal prior to operation Refer to slope indicators provided on the chassis to show whether the aerial device is positioned within limits permitted Slop...

Page 30: ...not fully extended the outrigger spread is reduced A Frame outriggers only This reduces the stability of the aerial lift For example when an outrigger rests on a curb the outrigger spread is reduced T...

Page 31: ...Electrical Hazards Are Present It is imperative that the aerial device operator understand the dangers associated with operating near electrical hazards Due to the work involved the ordinary uses of...

Page 32: ...ton momentarily to start the engine If the engine does not crank then the start stop button may require a second push to get the latching relay into the start position so the truck engine will turn ov...

Page 33: ...or in order to begin operating the booms Retracting the Outriggers With an Outrigger Boom Interlock System The booms must be stowed before the interlock system will allow the outriggers to be retracte...

Page 34: ...ggle in that position for a moment until the engine starts Allow the toggle to return to the neutral or centered position To stop the engine from the turret push the toggle to START STOP again Allow t...

Page 35: ...jerking motion resulting in unnecessary loads and stresses To operate two or more functions at the same time position the single stick handle anywhere in an area between the separate paths of the desi...

Page 36: ...plunger knob down once and release it To slow the engine to an idle from the upper controls push the plunger knob down and release it It is recommended that the engine be left at idle until faster lif...

Page 37: ...loads When lifting loads position the lower boom directly over the load before lifting The platform should be empty when lifting also contact the spring loaded platform support CAUTION FAILURE TO STO...

Page 38: ...ds When the truck is not level extreme caution must be used when rotating loads toward the low side because the truck stability will be affected The platform must not be used for material handling The...

Page 39: ...E AND RESULT IN DEATH OR SERIOUS INJURY TO THE OPERATOR OR GROUND CREW DANGER MAKE CERTAIN THE WINCH ROPE COILSARE SPOOLING EVENLYTO AVOID CLOGGING THE WINCH OR PRODUCING SHOCK LOADS AVOID SHOCK LOADS...

Page 40: ...URE RESULTING IN DEATH OR SERIOUS INJURY DANGER THERE MUST BE AT LEAST 5 COILS OF ROPE WOUND ON THE WINCH REEL AT ALL TIMES BECAUSE THE WINCH DRUM AND ROPE ATTACHMENT ARE NOT DESIGNED FOR FULL ROPE EX...

Page 41: ...outer boom It will be either red or white 2 Read the capacity from the outer boom pointer If the boom in step 1 was white read the capac ity from the white portion of the decal If the boom in step 1...

Page 42: ......

Page 43: ...gulations DANGER BEFORE ATTEMPTING TO RESCUE PERSONNEL ON THE AERIAL LIFT ALWAYS MAKE SURE THAT THE TRUCK AND THE AERIAL LIFT HAVE NOT BECOME ELECTRICALLY ENERGIZED CONTACT MADE BY RESCUERS FROM THE G...

Page 44: ...tab pressed down hydraulic flow will be diverted from the outriggers to the lift Another operator can then operate the lower controls to lower the booms WARNING USE OF MANUAL OVERRIDE TO OPERATE THE L...

Page 45: ...is encountered it must be repaired by the proper service personnel and the unit should be cleaned of excess hydraulic oil If a hydraulic leak is not repaired the oil in the reservoir will be depleted...

Page 46: ...ol The engine start stop control at the upper lower or cab controls can be used to stop the engine and hydraulic flow to the lift functions RESPONSIBILITIES AFTER EMERGENCY OPERATION After any emergen...

Page 47: ...le service with minimum maintenance A routine preventive maintenance program will assure extended aerial lift service The operator is responsible for detecting maintenance problems during the daily vi...

Page 48: ...ass The fiberglass outer surface of the booms should be cleaned daily with a lint free cloth If the fiberglass sections require a more thorough cleaning refer to Service Procedure Section Care of Fibe...

Page 49: ...U S N O M E U T D E W U H T I R F T A S E T A D S I R B E D H S A R T R O F S M O O B T C E P S N I S R E N E T S A F L A C I T I R C S D L E W L A C I T I R C S T E K C A J D E Y A R F S E N I L C I...

Page 50: ...6 4 29084 05 03 17 VERSALIFT VST 7500 I DAILY VISUAL INSPECTION...

Page 51: ...6 5 29084 05 03 17 VERSALIFT VST 7500 I DAILY VISUAL INSPECTION...

Page 52: ...6 6 29084 05 03 17 VERSALIFT VST 7500 I DAILY VISUAL INSPECTION...

Reviews: