Tillso Rake & Roll Operating & Maintenance Instructions Download Page 5

 

5 Operators Manual 

 

Introduction  
 
Foreword  
Make  sure  you  have  read  and  follow  the  
Operating Instructions carefully before using  
the  machine or component.  By  doing  so,  
you  will  avoid accidents, reduce repair costs 
and downtime and increase its reliability and 
service life. Pay particular attention to the 
safety instructions!  
 
TILLSO will not accept any responsibility for  
any damage or malfunctions resulting from  
failure  to  comply  with  the  Operating  
Instructions.  
 
These Operating Instructions will assist you  
in getting to know your machine and in using  
it correctly for its intended purposes. First,  
you  are  given  general  instructions  in  
handling the machine. This is followed by  
sections on servicing, maintenance and the  
action  to  be  taken  should  a  malfunction  
occur.  
 
These operating instructions are to be read  
and followed by all persons working on or  
with the machine, e.g.:  
 
• Operation (including preparation, remedying  
of  faults  in  the  operating  sequence  and  
servicing).  
• Maintenance (maintenance and inspection)  
• Transportation.  
 
Together with these 

Operating Instructions

you will receive a 

Spare Parts List

 and a 

Registration Form

. Field service technicians  

will  instruct  you  in  the  operation  and  
servicing of your machine. Following this,  
the  Machine  Registration  form  is  to  be  
returned  to  TILLSO.  This  confirms  your  
formal  acceptance  of  the  machine.  The  
warranty period begins on the date of delivery 
or installation, whichever is the latter. 
 

We   reserve   the   right   to   alter  
illustrations as well as technical 
data and  weights  contained  in  

these Operating Instructions for the purpose  
of improving the Product.  
 
Warranty Guidelines  
1. The period of liability for material  defects  
(warranty)  relating  to   our  products  is  12  

months.   In the case of written deviations  
from  the  statutory  provisions,  these  
agreements shall apply.  
 
They shall become effective upon installation  
of the machine with the end customer. All 
wear parts are excluded from the warranty.  
 
2. Warranty claims must be submitted to the  
TILLSO Customer  Service  Department  in  
Thorney via your dealer. It is only possible  
to process claims which have been correctly  
completed and submitted no later than 14  
days after the date of repair.  
 
3. In the case of deliveries made under the  
warranty which are subject to the return of  
the old parts, the old parts must be returned  
to TILLSO within 28 days after the damage  
occurred.  
 
4. In the case of deliveries made under the  
warranty which are not subject to the return  
of the old parts, these parts must be kept for  
the purpose of further decisions for a period  
of 3 months after receipt of the warranty 
claim.  
 
5.  Warranty  repairs  to  be  carried  out  by  
outside  companies,  or  repairs  which  are  
expected  to  take  more  than  10  working  
hours, must be agreed upon in advance with  
the Customer Service Department. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for Rake & Roll

Page 1: ...Tillso Rake Roll Operating Maintenance Instructions Safety Manual Parts Identification...

Page 2: ...pply of Machinery Safety Regulations 2008 The Provision and Use of Work Equipment Regulations 1998 Specifically related harmonised standards are BS EN ISO 12100 1 2003 Safety of Machinery BS EN ISO 12...

Page 3: ...er this warranty must be made by the original purchaser of the machine and is not assignable to any third party 7 If the purchaser hires out the machine to any third party the warranty shall apply onl...

Page 4: ...ent 10 2 Transportation installation 11 2 1 Delivery 11 2 2 Transportation 11 2 3 Installation 11 3 Technical Data 11 4 Adjustment Operation 12 4 1 Preparing for Operation 12 4 2 Preparing for Work 12...

Page 5: ...s confirms your formal acceptance of the machine The warranty period begins on the date of delivery or installation whichever is the latter We reserve the right to alter illustrations as well as techn...

Page 6: ...ing up the machine Watch out for escaping pressurised fluids Follow the instructions in the Operating Instructions Never reach into areas where there is a danger of being crushed by moving parts Parts...

Page 7: ...of fatal or serious injury It is important that all the safety instructions contained in these Operating Instructions and all the warning signs on the machine are read carefully Ensure that the warnin...

Page 8: ...risk will be borne solely by the operator Use of the Rake Roll in conjunction with any other machine for example in a cultivations train is not permitted unless with the express permission of TILLSO...

Page 9: ...ecified by the HSE and any agricultural trade associations It is the Operator s responsibility to ensure that all other persons are excluded from the danger zones surrounding or on the machine or comp...

Page 10: ...w ALL hydraulic hoses have a safe maximum working life of 6 SIX years from date of installation provided they remain in a safe condition Hoses which exceed 6 years of age should be replaced or inspect...

Page 11: ...orehand Operator instruction and initial installation of the machine are carried out by our service technicians or authorised distributors The machine must not be used in any way beforehand The machin...

Page 12: ...sent on the 12m machine only GREEN Wing transport support on drawbar Before activating the hydraulics ensure the tilt circuit taps are set as per below This setting should always be used when folding...

Page 13: ...an be manually controlled on the move by the tractor hydraulics or the desired pitch can be set via the adjustment circuit This returns to a pre set position when tilting downwards from the fully rear...

Page 14: ...to the working setting The pitch is now memorised The machine can be tilted rearwards upon releasing this pressure it will return back to the desired pitch 4 3 3 Fine tuning the Pitch Setting Once a...

Page 15: ...D Always choose a firm level surface for folding or unfolding Always face the machine upslope and not across slope so that the wings are sitting horizontal when unfolded TAKE CARE IN TRANSPORT THE CEN...

Page 16: ...raw rake keep the machine in its working setting at all times to maximise the straw levelling effect If straw builds up excessively tilt rearwards slightly to allow the straw to be spread out over the...

Page 17: ...ish Set this by adjusting the tilt setting main machine pitch and levelling the tines fore to aft by the turnbuckles as per above The wing wheels if fitted should be set to just maintain ground contac...

Page 18: ...alve 3 anticlockwise to do this To confirm the setting is improved partially tilt the machine forwards then partially fold the wings This releases pressure in the circuit Then unfold fully and pressur...

Page 19: ...re the scrapers if fitted still operable so that the rolls do not jam Are the DD axles tight to avoid wear 5 Servicing and Maintenance Follow the safety instructions for servicing and maintenance 5 1...

Page 20: ...ff In this setting work the tilt circuit pressuring either side in turn holding for a few seconds under pressure Alternately pressure either side at least 3 times NOTE when lowering back into ground c...

Page 21: ...fitted with a biologically based oil to resist rusting check Aqueel tyres for stone trapping and wear Remove replace as needed 5 9 Lubricating the Machine The machine must be lubricated regularly in o...

Page 22: ...ng Contact a doctor immediately General Contact Skin irritation caused by oil In case of prolonged skin contact wash off the oil with soap and water Oil Spills Use either sand or a suitable granular a...

Reviews: