MAINTENANCE
Boom
Maintenance Section 4-27
©2015 Alamo Group Inc.
MAINTENANCE
BEARING INSTALLATION
1.
Press upper bearing cup into the spindle
housing.
2.
Turn the spindle housing over and press in
the lower bearing cup.
3.
Place the lower bearing cone in the bearing
cup. Next press the seal into the spindle
housing. The inner lip of the seal must be
DOWN, towards the bearing, so lubricant is
sealed inside the housing.
4.
Install the spindle in the housing. Lightly
press the spindle to seat the cone onto the
spindle.
5.
Support the bottom of the spindle and press
the upper bearing cone and bearing adjustment sleeve onto the spindle.
6.
NOTE: The spindle housing must turn freely when seating the bearing cone and sleeve.
7.
Press the two upper seals into the spindle housing. The inner lip of the seals must be UP, away from
the bearing, so excess lubricant can escape.
8.
Install the bearing adjustment nut (thin nut) so there is 1-1/6” clearance between the nut and the
sleeve. Install the jam washer, placing the tab into the key-way. Install the bearing lock nut (thin nut)
and hand tighten against jam washer and adjustment nut. See the following section for bearing
adjustment.
9.
Position the spindle housing horizontally with the drain hole oriented “up”. Grease through the zerk
with Tiger Spindle Lubricant (part number 06540000) until the grease purges from the drain hole.
10.
Install the plug into the drain hole.
BEARING ADJUSTMENT
1.
Clamp the bottom end of the spindle
securely in a vise so the spindle housing
turns freely.
2.
Position a magnetic base dial indicator on
the outer diameter of the spindle housing.
Locate the end of the dial indicator against
the flat end of the spindle shaft. The dial
indicator will now measure accurately
bearing end play.
3.
Tighten the bearing adjustment nut until
there is .012 inch movement when the
spindle housing is pried upward away from
the vise jaws.
4.
When there is .012 inch free play between
the spindle and housing, install the bearing lock nut (thick nut). Hold the adjusting nut securely and
tighten the lock nut to 300 ft. lbs. of torque.
5.
After the lock nut is tightened, there must be .001 inch to .003 inch of free play when lightly prying up
on the spindle housing.
If the end play is correct, .001 inch to .003 inch, bend tabs up on jam washer to prevent the lock nut from
loosening.
If the end play is NOT correct, loosen the lock nut and turn the adjustment nut as required and re-tighten the
lock nut. Repeat first part of step 5.
Summary of Contents for WILDKAT JD6105-25E T4F
Page 4: ......
Page 6: ......
Page 7: ...Safety Section 1 1 2015 Alamo Group Inc SAFETY SECTION...
Page 25: ...SAFETY BOOM Safety Section 1 19 2015 Alamo Group Inc SAFETY...
Page 26: ...SAFETY BOOM Safety Section 1 20 2015 Alamo Group Inc SAFETY...
Page 27: ...SAFETY BOOM Safety Section 1 21 2015 Alamo Group Inc SAFETY...
Page 28: ...SAFETY BOOM Safety Section 1 22 2015 Alamo Group Inc SAFETY...
Page 29: ...SAFETY BOOM Safety Section 1 23 2015 Alamo Group Inc SAFETY...
Page 31: ...Assembly Section 2 1 ASSEMBLY SECTION JD6105 25E REAR STOW SIDE...
Page 51: ...Operation Section 3 1 2013 Alamo Group Inc OPERATION SECTION...
Page 96: ...OPERATION Boom Operation Section 3 46 2013 Alamo Group Inc OPERATION...
Page 97: ...Maintenance Section 4 1 2015 Alamo Group Inc MAINTENANCE SECTION...
Page 104: ...MAINTENANCE Boom Maintenance Section 4 8 2015 Alamo Group Inc MAINTENANCE...
Page 126: ...MAINTENANCE Boom Maintenance Section 4 30 2015 Alamo Group Inc MAINTENANCE...
Page 128: ...MAINTENANCE Boom Maintenance Section 4 32 2015 Alamo Group Inc MAINTENANCE...
Page 129: ...PARTS SECTION JD6105E REAR STOW SIDE...
Page 131: ...PARTS ORDERING GUIDE 2018 Alamo Group Inc Parts Section 3 JD6XXXE WILDKAT...
Page 132: ...TRACTOR MOUNT KIT 2018 Alamo Group Inc Parts Section 4 JD6XXXE WILDKAT...
Page 136: ...ELECTRONIC PROPORTIONAL LIFT VALVE MOUNT 2018 Alamo Group Inc Parts Section 8 JD6XXXE WILDKAT...
Page 138: ...JOYSTICK AND SWITCHBOX MOUNT 2018 Alamo Group Inc Parts Section 10 JD6XXXE WILDKAT...
Page 140: ...CANBUS JOYSTICK CONTROL 2018 Alamo Group Inc Parts Section 12 JD6XXXE WILDKAT...
Page 144: ...CANBUS ELECTRICAL SCHEMATIC 2018 Alamo Group Inc Parts Section 16 JD6XXXE WILDKAT...
Page 145: ...NOTES 2018 Alamo Group Inc Parts Section 17 JD6XXXE WILDKAT...
Page 146: ...COOLER MOUNT 2018 Alamo Group Inc Parts Section 18 JD6XXXE WILDKAT...
Page 148: ...BATTERY RELOCATION 2018 Alamo Group Inc Parts Section 20 JD6XXXE WILDKAT...
Page 150: ...SINGLE COLUMN BOOMREST 2018 Alamo Group Inc Parts Section 22 JD6XXXE WILDKAT...
Page 152: ...POLYCARBONATE SAFETY WINDOW 2018 Alamo Group Inc Parts Section 24 JD6XXXE WILDKAT...
Page 156: ...NOTES 1 2018 Alamo Group Inc Parts Section 28 JD6XXXE WILDKAT...
Page 157: ...COMMON REAR STOW SIDE PARTS SECTION Common Section 6 1...
Page 160: ...PARTS ORDERING GUIDE 2014 Alamo Group Inc Parts Section 6 4 COMMON RSS...
Page 161: ...BOOM MOUNT KIT 2014 Alamo Group Inc Parts Section 6 5 COMMON RSS...
Page 163: ...NOTES 2 2014 Alamo Group Inc Parts Section 6 7 COMMON RSS...
Page 164: ...BOOM ASSEMBLY FLAIL 2014 Alamo Group Inc Parts Section 6 8 COMMON RSS...
Page 166: ...BOOM ASSEMBLY ROTARY 2014 Alamo Group Inc Parts Section 6 10 COMMON RSS...
Page 170: ...60IN ROTARY DISK AND KNIVES 2014 Alamo Group Inc Parts Section 6 14 COMMON RSS...
Page 173: ...NOTES 2014 Alamo Group Inc Parts Section 6 17 COMMON RSS...
Page 174: ...ROTARY MOWER SPINDLE ASSEMBLY 2014 Alamo Group Inc Parts Section 6 18 COMMON RSS...
Page 180: ...FLAIL DRIVE ASSEMBLY 2014 Alamo Group Inc Parts Section 6 24 COMMON RSS...
Page 182: ...BOOM PIVOT ASSEMBLY 2017 Alamo Group Inc Parts Section 6 26 COMMON RSS...
Page 184: ...SLIDE ASSEMBLY 2017 Alamo Group Inc Parts Section 6 28 COMMON RSS...
Page 191: ...NOTES 1 2014 Alamo Group Inc Parts Section 6 35 COMMON RSS...
Page 192: ...FRONT PUMP BREAKDOWN 2014 Alamo Group Inc Parts Section 6 36 COMMON RSS...
Page 194: ...ROTARY MOTOR BREAKDOWN 2014 Alamo Group Inc Parts Section 6 38 COMMON RSS...
Page 196: ...FLAIL MOTOR BREAKDOWN 2014 Alamo Group Inc Parts Section 6 40 COMMON RSS...
Page 198: ...COOLER ASSEMBLY OPTION 2014 Alamo Group Inc Parts Section 6 42 COMMON RSS...
Page 203: ...MANUAL LIFT VALVE SWITCH BOX SCHEMATIC 2014 Alamo Group Inc Parts Section 6 47 COMMON RSS...
Page 205: ...ELECTRONIC LIFT VALVE SCHEMATIC 2014 Alamo Group Inc Parts Section 6 49 COMMON RSS...
Page 208: ...BRAKE VALVE HYDRAULIC SCHEMATIC 2014 Alamo Group Inc Parts Section 6 52 COMMON RSS...
Page 209: ...ELECTRICAL TROUBLESHOOTING GUIDE 2014 Alamo Group Inc Parts Section 6 53 COMMON RSS...
Page 210: ...HYDRAULIC TROUBLESHOOTING GUIDE 2014 Alamo Group Inc Parts Section 6 54 COMMON RSS...
Page 211: ...TROUBLESHOOTING 2014 Alamo Group Inc Parts Section 6 55 COMMON RSS...
Page 212: ...TROUBLESHOOTING CONTINUED 2014 Alamo Group Inc Parts Section 6 56 COMMON RSS...
Page 213: ...FIRE SUPPRESSION SYSTEM 2014 Alamo Group Inc Parts Section 6 57 COMMON RSS...
Page 214: ...FIRE SUPPRESSION 3 POINT MOUNT 2014 Alamo Group Inc Parts Section 6 58 COMMON RSS...
Page 216: ...FIRE SUPPRESSION FRONT MOUNT 2014 Alamo Group Inc Parts Section 6 60 COMMON RSS...
Page 219: ...WETCUT 2014 Alamo Group Inc Parts Section 6 63 COMMON RSS...
Page 222: ...WETCUT 3PNT PLUMBING 50IN MOWERS 2014 Alamo Group Inc Parts Section 6 66 COMMON RSS...
Page 224: ...WETCUT 3PNT PLUMBING LARGE MOWERS 2014 Alamo Group Inc Parts Section 6 68 COMMON RSS...
Page 226: ...WETCUT FRONT PLUMBING 50IN MOWERS 2014 Alamo Group Inc Parts Section 6 70 COMMON RSS...
Page 228: ...WETCUT FRONT PLUMBING LARGE MOWERS 2014 Alamo Group Inc Parts Section 6 72 COMMON RSS...
Page 230: ...WETCUT 50IN SPRAYER HEAD ASSEMBLY 2014 Alamo Group Inc Parts Section 6 74 COMMON RSS...
Page 232: ...WETCUT 60IN SPRAYER HEAD ASSEMBLY 2014 Alamo Group Inc Parts Section 6 76 COMMON RSS...
Page 234: ...WETCUT CABLES 2014 Alamo Group Inc Parts Section 6 78 COMMON RSS...
Page 235: ...WARRANTY SECTION Warranty Section 7 1...
Page 236: ......
Page 240: ...Printed in USA Tiger Corporation...