Assembly Section 3-12
RBF-12C 07-04
ASSEMBLY
© 2004
Alamo Group Inc.
FLEXIBLE FRONT GUARD KIT
A Flexible Front Guard can be fitted for grass cutting, either to the front of the cowl, or to the rear of the
forward rotation. See
FIGURE 3-11.
This flap is fitted to the front of the cowl after removal of the wire trap and steel guard.
ACCUMULATOR KIT
The accumulator is positioned at the front of the mainframe, and is clamped to a plate welded to the 100
x 50 rectangular tubing.
It is first necessary to assemble the following parts to the accumulator unit itself before attempting to fit it
to the machine.
Assembling the Kit
(refer to
FIGURE 3-12
)
A. Remove the kit from its packing and check that all parts are present. Refer to the Parts Section on
the Accumulator Kit, for a complete listing of parts.
B. Assemble items 3 thru 8 into accumulator and fully tighten connections.
Fitting the Kit
A. Fit packing piece item 2 onto the accumulator.
B. Fit clamping bracket 1 loosely to plate on front of mainframe with setscrews, spring washer and nuts
provided.
C. Slide accumulator with packer fitted into the clamping bracket. Position isolator valve knob facing
outwards so that it can be operated easily when machine is fitted to the tractor.
D. Locate the hose connecting the control valve to the first ram. Refer to the Parts Section.
E. Disconnect the hose at the adaptor in the control valve.
G. Re-connect the hose from the first ram to the tee adaptor.
H. Connect straight end of hose 9 to the adaptor on the accumulator.
I. Fit 90 deg. end to tee adaptor on control valve.
J. Fully tighten all connections.
FIGURE 3-11
Forward
Rotation
Summary of Contents for RBF-12C
Page 4: ......
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 33: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 35: ...Assembly Section 3 1 ASSEMBLY SECTION...
Page 42: ...Assembly Section 3 8 RBF 12C 07 04 ASSEMBLY 2004 Alamo Group Inc FIGURE 3 6...
Page 47: ...Assembly Section 3 13 RBF 12C 07 04 ASSEMBLY 2004 Alamo Group Inc FIGURE 3 12...
Page 50: ......
Page 51: ...Operation Section 4 1 OPERATION SECTION...
Page 73: ...Operation Section 4 23 OPERATION RBF 12C 07 04 2004 Alamo Group Inc...
Page 82: ......
Page 83: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Page 91: ...RBF 12C OMWPL 07 04 Printed U S A P N 06060001...