BEFORE YOU GET STARTED
04
tigersheds.com
0113 205 4189
TOOLS REQUIRED:
We recommend using the following tools (not supplied):
LADDER
TAPE MEASURE
SHARP KNIFE
SPIRIT LEVEL
SCREW
• Assembly is relatively straightforward if you follow these step by step instructions.
• We recommend getting everything aligned properly before screwing together and that
screw holes should be pre-drilled to avoid splitting the timber.
(Do not come pre-drilled).
IMPORTANT
• Before assembly please make sure you have a suitable base ready to erect your building on.
• This base
MUST
be firm and level to ensure that the building is assembled properly and lines up.
• Please carefully unpack the components in your delivery, and remove the timber supports that make up the
delivery pallet.
•
CAUTION:
Parts may have moved during transportation. Be careful when unpacking supplied shed.
•
DO NOT
start your build until you have checked that all the parts of your building are present, correct and in a
suitable condition.
• Pre-drilling screw holes is recommended to reduce the chances of the timber framing splitting.
• If you are organising a third party to install your building, it is best practice not to schedule this immediately on receipt of your
order, to give you time to check your delivery.
RUBBER MALLET
FIXING KIT GUIDE:
S70
Screws
(70mm Galvanised - QTY 55)
S100
Screws
(100mm Galvanised - QTY 10)
IMPORTANT:
Customer to supply own fixings
for type of ground.
Posts 92mm square.
DRILL