![TIE DOWN 71089 Instruction Manual Download Page 5](http://html1.mh-extra.com/html/tie-down/71089/71089_instruction-manual_1114445005.webp)
TIE DOWN
Safety Products Division
800-241-1806 • 404-344-0000 • www.tiedown.com
E1805, Rev. 10/12/21
5
Hatch Rail System
Swing Gate
Hinge Tab
Swing Gate
Safety Pin
Swing Gate
Hinge Pin
Swing Gate
Spring
Swing Gate Assembly
Swing Gate
Post
Swing Gate
Assembly
Flat Work Surface
Swing Gate
Spring
Tools needed for this step:
3/8” socket wrench
Med Phillips screwdriver
Level
Hardware required for this step:
Qty.
Hatch Rail Gate Assembly (C)
1
Swing Gate Pin (3/8”x3-1/4”) (K)
2
Swing Gate Tension Spring (L)
2
Swing Gate Safety Pin (M)
2
Hatch Rail Swing Gate Post (D)
1
Lay the Swing Gate Assembly tread brite side face
down. See Fig. 5-1.
Position the swing gate post at a 90 degree angle,
aligning the gate post holes with swing gate holes.
See Fig 5-2.
Hold the tension spring in place between the swing
gate hinge tabs. Slide the swing gate pin through
the tabs and spring out to the opposite side tab.
Secure pin with the safety pin. See Fig. 5-3. Repeat
for the second pin/spring mount.
Fig. 5-1
Fig. 5-3
Fig. 5-2