![TIE DOWN 71089 Instruction Manual Download Page 4](http://html1.mh-extra.com/html/tie-down/71089/71089_instruction-manual_1114445004.webp)
TIE DOWN
Safety Products Division
800-241-1806 • 404-344-0000 • www.tiedown.com
E1805 Rev. 10/12/21
4
Hatch Rail System
Install Hatch Post
Swing Gate Post
Tools needed for this step:
3/8” socket wrench
Level
Hardware required for this step:
Qty.
Hatch Rail Vertical Post (A)
3
Nylock Nut (3/8”) (H)
6
Carriage Bolt (3/8”x 3-1/2”) (I)
6
Install three post leaving the swing gate post for
last for installation.
Slide the carriage bolt though the mounting
bracket and hatch post. Secure with nylock nut.
Torque nuts to 20 ft lbs. Fig 4-2.
Using a level, plumb the hatch post while
tightening the threaded nut clips.
Fig. 4-1
Fig. 4-2
Fig. 4-3