TIE DOWN 71089 Instruction Manual Download Page 4

TIE DOWN 

Safety Products Division

800-241-1806   •   404-344-0000  •  www.tiedown.com

E1805 Rev. 10/12/21

4

Hatch Rail System

Install Hatch Post

Swing Gate Post

Tools needed for this step:

 

3/8” socket wrench

 Level

Hardware required for this step: 

Qty.

 

Hatch Rail Vertical Post (A) 

3

 

Nylock Nut (3/8”) (H) 

6

 

Carriage Bolt (3/8”x 3-1/2”) (I) 

6

Install three post leaving the swing gate post for 
last for installation.

Slide the carriage bolt though the mounting 
bracket and hatch post. Secure with nylock nut.
Torque nuts to 20 ft lbs. Fig 4-2.

Using a level, plumb the hatch post while
tightening the threaded nut clips.

Fig. 4-1

Fig. 4-2

Fig. 4-3

Summary of Contents for 71089

Page 1: ...own to the State of California to cause cancer For more information WARNING This product can expose you to chemicals including Nickel which is known to the State of California to cause cancer For more...

Page 2: ...I K J L M Description Box 2 of 2 Qty E Corner Mounting Bracket 4 F Hex Bolt 3 8 x1 1 8 16 G Threaded Nut Clip 16 H Nylock Nut 3 8 8 I Carriage Bolt 3 8 x 3 1 2 8 J Cross Over Bracket 8 K Swing Gate P...

Page 3: ...Hardware required for this step Qty Corner Mounting Bracket E 4 Carriage Bolt 3 8 x1 1 8 F 16 Threaded Nut Clip G 16 Place the corner mounting bracket in position as show in Fig 3 1 Using the brackets...

Page 4: ...ware required for this step Qty Hatch Rail Vertical Post A 3 Nylock Nut 3 8 H 6 Carriage Bolt 3 8 x 3 1 2 I 6 Install three post leaving the swing gate post for last for installation Slide the carriag...

Page 5: ...step Qty Hatch Rail Gate Assembly C 1 Swing Gate Pin 3 8 x3 1 4 K 2 Swing Gate Tension Spring L 2 Swing Gate Safety Pin M 2 Hatch Rail Swing Gate Post D 1 Lay the Swing Gate Assembly tread brite side...

Page 6: ...Hatch Rail Swing Gate Post D 1 Cross Over Bracket 1 Slide cross over bracket from the bottom of the swing gate post Loosely tighten the cross over bracket nut See Fig 6 1 Mount the swing gate post to...

Page 7: ...er vertical post as shown in Fig 7 1 The lower cross over bracket should be positioned approximatively 20 in from the bottom of the corner mounting bracket Lightly tighten the 3 8 nut on the cross ove...

Page 8: ...Using a level level the horizontal rails Tighten the 3 8 grub screw for the horizontal rails See Fig 8 2 Using your hand hold the bottom of the cross over bracket with the hatch post Do not move the b...

Reviews: