background image

4AZ900-00 

3

HAND CRANK SUPPORT INSTALLATION 

25

Installation der Handkurbelstütze / Installatie handzwengelsteun / Installation du repose-manivelle / Installazione 
del supporto della manovella manuale / Instalación del soporte de la manivela / Installation av handvevsstöd / 
Käsikammen tuen asennus / Håndsving hjælper med installation / Håndsveivstøttemontering / Instalacja wsparcia 
korby ręcznej

10 ACCESSORIES 

26

Zubehör / accessoires / accessoires / accessori / accesorios / tillbehör / tarvikkeet / tilbehør / tilbehør / akcesoria

Summary of Contents for 4200 3028 Series

Page 1: ... Instructions Bring your life thule com 2021 06 16 Thule 4200 3028XX 4AZ900 00 3380066800 USER INSTALLATION ...

Page 2: ... Lukke Zamknij INSTALLATION 16 4 CONTENT 16 Inhalt inhoud contenu contenuto contenido innehåll sisältö indhold innhold zawartosc 5 TOOLS 17 Werkzeuge gereedschappen outils strumenti herramientas verktyg työkalut værktøjer verktøy narzedzia 6 GUTTER INSTALLATION 18 Dachrinnen Installation Installatie goot Installation de la gouttière Installazione della grondaia Instalación del canalón Installation...

Page 3: ...llazione del supporto della manovella manuale Instalación del soporte de la manivela Installation av handvevsstöd Käsikammen tuen asennus Håndsving hjælper med installation Håndsveivstøttemontering Instalacja wsparcia korby ręcznej 10 ACCESSORIES 26 Zubehör accessoires accessoires accessori accesorios tillbehör tarvikkeet tilbehør tilbehør akcesoria ...

Page 4: ...4 4AZ900 00 1 WARNINGS INFO Safety Instructions OK NOK Safety Instructions OK NOK Safety Instructions OK NOK Safety Instructions OK NOK Safety Instructions OK NOK Safety Instructions OK NOK USER ...

Page 5: ...USER Safety Instructions OK NOK CLOSE THE AWNING OPTION 307916 2 6 m 3 0 m 3 5 m 4 0 m 4 5 m CLOSE THE AWNING OPTION 307916 2 6 m 3 0 m 3 5 m 4 0 m 4 5 m CLOSE THE AWNING OPTION 307916 2 6 m 3 0 m 3 5 m 4 0 m 4 5 m ...

Page 6: ...6 4AZ900 00 USER 90 OPEN CLOSE 90 OPEN CLOSE Max 1 m Max 1 m 2 OPEN A B A B C 1 2 OPEN ...

Page 7: ...4AZ900 00 7 USER Max 1 m Max 1 m 3 A B 1 2 1 2 3 4 ...

Page 8: ...8 4AZ900 00 USER MAX C D OPEN OPEN ...

Page 9: ...4AZ900 00 9 USER D d EXTRA TENSION 4 TENSION RAFTER G2 307307 307309 2 6M 307307 3 0M 307309 3 5M 307309 4 0M 307309 4 5M 307309 OPTION OPTION OPTION A B TENSION N 8 x1 x1 x1 x1 x1 ...

Page 10: ...10 4AZ900 00 USER EXTRA TENSION EXTRA TENSION D E D d C ...

Page 11: ...4AZ900 00 11 USER 5 6 TENSION CLOSE ...

Page 12: ...12 4AZ900 00 USER 1 2 3 CLOSE OPEN ...

Page 13: ...4AZ900 00 13 USER 3 TENSION RAFTER G2 307307 307309 2 6M 307307 3 0M 307309 3 5M 307309 4 0M 307309 4 5M 307309 OPTION OPTION OPTION A B ...

Page 14: ...14 4AZ900 00 USER 5 Max 1 m Max 1 m A 1 2 3 4 4 Max 1 m CLOSE ...

Page 15: ...4AZ900 00 15 USER Max 1 m B C 2 1 6 x2 CLOSE ...

Page 16: ... x6 x8 x4 x4 x4 x4 x4 x4 x4 x4 x4 x4 2 6m 3 0m 3 5m 4 0m 4 5m x5 x5 x5 x6 x5 x7 x7 x7 x8 x10 x7 x7 x7 x8 x10 x4 x4 x4 x4 x4 x4 x4 x4 x4 x4 x4 x4 x4 x4 x4 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x1 x1 x1 x1 40mm 80mm 175mm 400mm M6 x 55 mm DIN 965 TX30 M6 x 55 mm DIN 603 4 2 x 25 mm DIN 7981 TX20 4 2 x 25 mm DIN 7982 TX20 4 2 x 16 mm DIN 7504N TX20 M6 DIN 934 M6 DIN 6798 M5 DIN 125 AWNING INSTALLATION ...

Page 17: ...4AZ900 00 17 INSTALLATION 5 TOOLS 4 x 21 2 mm A2 x1 x1 x1 Sealing Rubber OPTIONAL 302690 302693 P120 Activator sika Ø 6 mm Ø 4 mm Ø 3 5 mm SIKA 221 TX20 N 10 ...

Page 18: ...18 4AZ900 00 INSTALLATION 2493 mm T4200 2 6M 2893 mm T4200 3 0M 3393 mm T4200 3 5M 3893 mm T4200 4 0M 4393 mm T4200 4 5M A B C OPTIONAL 6 GUTTER INSTALLATION 1 ...

Page 19: ...TION 7 INSTALLATION 1 2 60 m 3 00 m 4 00 m 3 50 m 130 130 150 150 150 150 300 800 300 130 130 FIX X or Y FIX X or Y FIX Y or Z FIX Y or Z 4 50 m FIX Y or Z P120 P120 DEGREASER Activator sika P120 Activator sika A B 1 2 3 4 ...

Page 20: ...20 4AZ900 00 INSTALLATION SIKA 221 FIX X FIX Y SIKA 221 x5 8 x5 6 x7 10 x3 4 x2 3 x2 A B C D Ø 6 mm E min 60 mm 1 4 OPEN SIKA 221 TX20 N 10 TX20 TX20 2 A B C ...

Page 21: ...4AZ900 00 21 INSTALLATION SIKA 252 Safety FIX Y SIKA 221 A B D E E C min 60 mm SIKA 221 FIX Z A B D C TX20 ...

Page 22: ...22 4AZ900 00 INSTALLATION 8 FOOT SUPPORT INSTALLATION 65 mm 85 mm 26 mm 65 mm 85 mm 26 mm A B 1 ...

Page 23: ...P120 Activator sika SIKA 221 Ø 3 5 mm Ø 4 mm P120 Activator sika SIKA 221 Ø 3 5 mm Ø 4 mm P120 Activator sika SIKA 221 Ø 3 5 mm Ø 4 mm P120 Activator sika SIKA 221 Ø 3 5 mm Ø 4 mm SIKA 221 x4 x4 x4 x4 TX20 2 A B 3 1 2 3 Activator sika P120 P120 ...

Page 24: ...24 4AZ900 00 INSTALLATION 4 A B C ...

Page 25: ...4AZ900 00 25 INSTALLATION 9 HAND CRANK SUPPORT INSTALLATION 1 x 2 x 2 x4 TX20 ...

Page 26: ...6 4AZ900 00 10 ACCESSORIES Thule Hold Down Side Strap Kit 307916 Thule LED Strip 307135 307137 Thule Sealing Rubber 302690 302693 Thule Sealing Rubber 306891 306892 Thule Tension Rafter G2 307307 307309 ...

Page 27: ...4AZ900 00 27 Thule Rain Blocker G2 Thule Sun Blocker G2 Thule Windscreen Thule Residence G3 Thule QuickFit ...

Page 28: ...Thule NV Kortrijkstraat 343 BE 8930 Menen BELGIUM infoRV thule com www thule com Thule Group 2020 All rights reserved 4AZ900 00 ...

Reviews: